Run Date: 09/09/2005 10:57:21 <br /> City of Eugene Page 7 <br /> Contract Preliminary Progress Payment <br /> Payment No 003 <br /> Contractor: BROWN CONT. <br /> Job 93-004309 Original Contract: $310,294.00 <br /> Contract No: 2005-00028 Current Amount: $322,619.68 <br /> PO 2005050487 Contract Award Date: 05/23/2005 <br /> Assessable: Yes Completion Date: 10/07/2005 <br /> Line Description Last Chng Ord Current Contract Estimated Payment Cumulative Totals <br /> - Unit Price Unit Measure Quantity 8 Complete <br /> Amount aatit Amount Quantity <br /> Amount <br /> 0772 ALLEY#24 STM DRAIN CHANGES 002 <br /> $1,949.20 fiACH 1.000 $1,949.20 0.000 <br /> 0773 ALLEY#24-EXCAVATION AROUND CON 003 $0.00 1.000 $1,949.20 100.00 <br /> $828.53 LUMPSUM 1.000 $828.53 0.000 <br /> Alley #24 $0.00 1.000 $828.53 100.00 <br /> 0774 REM 3 4"-0" TRANSITION AREA/RE 004 <br /> $304.63 LUMPSUM 1.000 $304.63 1.000 <br /> 0775 CONST STAMP NAME/DATE-ALLEY24 006 $304.63 1.000 304.63 100.00 <br /> $78.30 LUMPSUM 1.000 $78.30 1.000 <br /> Alley #26 $78.30 1.000 $78.30 100.00 <br /> 0780 MOBILIZATION <br /> $3,000.00 LUMPSUM 1.000 $3,000.00 0.000 <br /> 0790 TEMP PROTfiCTN DIRECTN $0.00 1.000 $3,000.00 100.00 <br /> $1,610.00 LUMPSUM 1.000 $1,610.00 0.900 <br /> 0800 TREE PROTECTION FENCING $644.00 0.900 $1,449.00 90.00 <br /> $3.50 LINFT 45.000 $157.50 0.000 <br /> 0810 EROSION CONTROL 50.00 0.000 $0.00 0.00 <br /> $325.00 LUMPSUM 1.000 $325.00 0.400 <br /> 0820 10" DRAIN PIPfi $130.00 0.900 $292.50 90.00 <br /> $45.00 LINFT 102.000 <br /> 0830 CATCH BASINS $4,590.00 0.000 $0.00 102.000 $4,590.00 100.00 <br /> $1,100.00 fiACH 3.000 $3,300.00 0.000 <br /> 0840 CONNECTION TO fiXISTING STRUCTU $0.00 3.000 $3,300.00 100.00 <br /> $500.00 EACH 1.000 $500.00 0.000 <br /> 0850 GENERAL EXCAVATION 50.00 1.000 $500.00 100.00 <br /> $35.00 CUYD 170.000 $5,950.00 158.600 <br /> 0860 SUBGRADE STABILIZATION $5,551.00 300.000 $10,500.00 176.00 <br /> $50.00 CUYD 91.000 $4,550.00 0.000 <br /> 0870 SUBGRADE GEOTEXTILE $0.00 0.000 $0.00 0.00 <br /> $1.00 SQYD 545.000 $545.00 216.300 <br /> 0880 3 4 INCH-0 'AGGREGATE BASE SURF $216.30 527.400 $527.40 97.00 <br /> 3.00 S P"1' 471.000 $1,413.00 502.000 <br /> 0890 1 1/2"-0 AGGREGATE BASS $1,506.00 502.000 $1,506.00 107.00 <br /> $20.00 COYD 91.000 $1,820.00 46.500 <br /> 0900 LEVEL 2, 1/2 INCH DENSE HMAC $930.00 117.200 $2,344.00 129.00 <br /> $5.00 SQFT 328.000 $1,640.00 387.700 <br /> <br /> 0910 PLAIN CONC PVMNT, UNDOWELLED, $1,938.50 387.700 $1,938.50 118.00 <br /> $4.00 S FT 4,931.000 19 724.00 5 051.600 <br /> 20 206.40 5,051.600 $20,206.40 102.00 <br /> <br />