Run Date: 09/09/2005 10:57:21 <br /> City of Eugene Page 8 , <br /> Contract Preliminary Progress Payment <br /> Payment No 003 <br /> Contractor: BROWN CONT. <br /> Job 93-004309 Original Contract: $310,294.00 <br /> Contract No: 2005-00028 Current Amount: $322,619.68 <br /> PO 2005050487 Contract Award Date: 05/23/2005 <br /> Assessable: yes Completion Date: 10/07/2005 <br /> Line Descrintioa Last Chn Ord Current Contract Estimated Pa ent <br /> Unit Price Unit Measure Quantity ~ Cumulative TOta18 6 Complete <br /> Amount antit Amount antit Amount <br /> 0920 CONCRETE PUMPING <br /> $0.20 SQPT 5,188.000 $1,037.60 0.000 <br /> 0930 5 INCH CONC SURFACING ~ $0.00 0.000 $0.00 0.00 <br /> $9.00 SQFT 287.000 $2,583.00 137.600 <br /> 0940 TOPSOIL $1,238.40 137.600 $1,238.40 48.00 <br /> 5.00 S FT 163.000 815.00 197.100 <br /> 0950 TIE BARS 985.50 197.100 $985.50 121.00 <br /> $6.00 EACH 40.000 <br /> 0960 SAW CUTTING $240.00 47.000 $282.00 47.000 $282.00 118.00 <br /> $3.00 LINFT 292.000 <br /> 0970 REMOVE HEDGfi $876.00 0.000 $0.00 300.000 $900.00 103.00 <br /> $300.00 LUMPSUM 1.000 $300.00 0.000 <br /> ~ q l9 ` L~K o.oo l.ooo S3oo.o0 loo.oo <br /> 0971 ALLEY #26 - TREE REMOVAL 001 <br /> $850.00 EACH 1.000 <br /> Alley #26 $850.00 0.000 $0.00 1.000 $850.00 100.00 <br /> 0972 INSTALL CB CLOSE TO EXISTING A 004 <br /> $198.72 LUMPSUM 1.000 $198.72 1.000 <br /> 0973 INSTALL 4" PVC PRIVATE LANDOWE 004 $198.72 1.000 $198.72 100.00 <br /> 973.93 LUMPSUM 1.000 973.93 1.000 <br /> 0974 CONST STAMP NAME/DATE-ALLEY 26 006 973.93 1.000 $973.93 100.00 <br /> $198.60 LUMPSUM 1.000 $198.60 1.000 <br /> Alley #27 $198.60 1.000 $198.60 <br /> 100.00 <br /> 0980 MOBILIZATION <br /> $3,000.00 LUMPSUM 1.000 $3,000.00 0.000 <br /> 0990 TEMP PROTECTN DIRECTN $0.00 1.000 $3,000.00 100.00 <br /> 1,720.00 LUMPSUM 1.000 1 720.00 0.000 <br /> 1000 TREE PROTECTION FENCING 0.00 0.900 $1 548.00 90.00 <br /> $3.50 LINFT 25.000 $87.50 0.000 <br /> 1010 EROSION CONTROL $0.00 0.000 $0.00 0.00 <br /> $325.00 LUMPSUM 1.000 $325.00 0.000 <br /> 1020 10" DRAIN PIPE $0.00 0.900 $292.50 90.00 <br /> 45.00 LINFT 49.000 <br /> 1030 CATCH BASINS $2,205.00 0.000 $0.00 48.600 2 187.00 99.00 <br /> $1,100.00 EACH 3.000 $3,300.00 0.000 <br /> <br /> 1040 CONNECTION TO EXISTING STRUCTU $0.00 3.000 $3,300.00 100.00 <br /> $500.00 EACH 1.000 $500.00 0.000 <br /> $0.00 1.000 $500.00 100.00 <br /> <br />