Run Date: 10/12/2005 09:08:39 Page 3 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 004 Final Pay <br /> Contractor: BROWN CONT. Original Contract: $310,294.00 <br /> Job 93-004309 Current Amount: $322,619.68 <br /> Contract No: 2005-00028 Contract Award Date: 05/23/2005 <br /> PO 2005050487 Completion Date: 10/07/2005 <br /> Assessable: Yes <br /> Current Contract fistimated Payment Cumulative Totals ~ Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quaat ity Amount Quantity Amount <br /> 0160 TIH BARS $6.00 EACH 23.000 <br /> $138-00 0.000 $0.00 18.000 $108.00 78.00 <br /> 0170 SAWCUTTING $3.00 LINFT 237.000 <br /> $711.00 0.000 $0.00 212.000 $636.00 89.00 <br /> 0171 ALLEY #4 SAWCUTTING-ADDITIONAL 001 <br /> $108.00 LUMPSUM 1.000 $108.00 0.000 $0.00 1.000 <br /> $108.00 100.00 <br /> 0172 ALLEY#4 RHM/REPL 4" DOWNSPOUT( 002 $538.88 LUMPSUM 1.000 <br /> $538.88 0.000 $0.00 1.000 $538.88 200.00 <br /> 0173 ALLEY#4 FORM/POUR CB TOP W/REI 002 $398.73 LUMPSUM 1.000 <br /> $398.73 0.000 $0.00 1.000 $398.73 100.00 <br /> Alley #9 <br /> 0180 MOBILIZATION $3 000 00 LUMPSIIM 1 000 <br /> $3,000.00 0.000 $0.00 1.000 $3,000.00 100.00 <br /> 0190 TEMP PROTECTN/DIRECTN $1,610.00 LUMPSUM 1.000 <br /> $1,610.00 0.100 $161.00 1.000 $1,610.00 100.00 <br /> 0200 TRHH PROTECTION FENCING $3.50 LINFT 20.000 <br /> $70.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0210 EROSION CONTROL $325.00 LUMPSUM 1.000 <br /> $325.00 0.100 $32.50 1.000 $325.00 100.00 <br /> oaao 10• DRAIN PIPS $45.00 LINPT 28.000 <br /> $1,260.00 0.000 $0.00 59.700 $2,686.50 213.00 <br /> 0230 MINOR ADJUSTMENT OF MANHOLES $500.00 EACH 1.000 <br /> $500.00 0.000 $0.00 1.000 $500.00 100.00 <br /> 0240 CATCH BASINS $1 300 00 EACH 2 000 $2 600 00 0.000 $0.00 2.000 $2,600.00 100.00 <br /> 0250 GENERAL EXCAVATION $34.00 CUYD 70.000 $2,380.00 0.000 $0.00 61.800 <br /> $2,101.20 88.00 <br /> <br /> 0260 SUBGRADE STABILIZATION $50.00 CUYD 38.000 <br /> S1,9oo.00 0.000 $o.oo o.ooo $o.oo o.oo <br /> 0270 SUBGRADE GEOTEXTILE $1.00 SQYD 203.000 $203.00 0.000 <br /> So.oo lo.soo $lo.so s.oo <br /> <br /> 0280 3/4 INCH-0 AGGREGATE BASfi SURP $4.00 SQFT 93.000 $372.00 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> 0290 1 1/2•-0 AGGRHGATB BASE $20.00 CUYD 38.000 <br /> $760.00 0.000 $0.00 2.400 $48.00 6.00 <br /> <br /> 0300 LEVEL 2, 1/2 INCH D$NSB BN11C <br /> &4.00 3QFT 107.000 $428.00 0.000 $0.00 396.000 <br /> $1,584.00 370.00 <br /> <br /> 0320 PLAIN CONC PVMNT, UNDOWELLED, Q $8,256.00 0.000 $0.00 2,028.000 <br /> $4.00 S FT 2,064.000 <br /> $8,112.00 98.00 <br /> <br />