Run Date: 10/12/2005 09:08:39 Page 2 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 004 Final Pay <br /> Contractor: BROWN CONT. <br /> Job 93-004309 Original Contract: $310,294.00 <br /> Current Amount: $322,619.68 <br /> Contract No: 2005-00028 Contract Award Date: 05/23/2005 <br /> PO 2005050487 ' <br /> Assessable: Yes Completion Date: 10/07/2005 <br /> Current Contract Estimated Payment Cumulative Totals i' Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> WEST iR7IVERSiTY ALLHYS 4, 9, 14, 24, 26, 27, & 30 <br /> Alley #4 <br /> 0000 Liquidated Damages Phase 1 ($180.00) DAY 0.000 <br /> $o.oo o.ooo $o.oo o.ooo $o.oo o.oo <br /> 0000 Liquidated Damages phase 2 ($100.00) DAY 0.000 <br /> $0.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0000 Liquidated Damages Phase 3 ($220.00) DAY 0 000 <br /> $0 00 0 000 $0 00 0 000 $0 00 0 00 <br /> 0010 MOBILIZATION $3,500.00 LUMPSUM 1.000 <br /> $3,500.00 0.000 $0.00 1.000 $3,500.00 100.00 <br /> 0020 TEMP PROTECTN/DIRECTTI $1,980.00 L[IMPSUM 1.000 <br /> $1,980.00 0.100 $198.00 1.000 $1,980.00 100.00 <br /> 0030 TREE PROTECTION FENCING <br /> $3.50 LINFT 25.000 $87.50 0.000 $0.00 0.000 <br /> $0.00 0.00 <br /> 0040 EROSION CONTROL $325.00 LUMPSUM 1.000 $325.00 0.100 $32.50 1.000 $325.00 100.00 <br /> 0050 10" ORAZN PIPE $54.00 LINFT 28.000 <br /> $1,512.00 0.000 $0.00 30.300 $1,636.20 108.00 <br /> 006D CATCH BASINS $1,300.00 EACH 2.000 <br /> $z,6oo.00 0.000 $o.oo z.ooo $z,6oo.0o Ioo.oo <br /> 0070 CONNECTION TO EXISTING PIPE <br /> $250.00 EACH 1.000 $250.00 0.000 $0.00 1.000 <br /> $250.00 100.00 <br /> 0080 GENERAL EXCAVATION $30.00 CUYD 85.000 <br /> $2,550.00 0.000 $0.00 77.900 $2,337.00 92.00 <br /> 0090 SUBGRADE STABILIZATION $50.00 CUYD 43.000 $2,150.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0100 SUBGRADE GEOTEXTILE $1.00 SQYD 260.000 <br /> $260.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0110 LEVEL 2, 1/2 INCH DENSE HMAC $5.00 SQFT 290,000 $1,450.00 0.000 $0.00 212.700 $1,063.50 73.00 <br /> 0120 PLAIN CONC PVMNT, UNDOWELLED, $4.00 SQFT 2 324.000 $9 296 00 0 000 $0 00 2 371 600 $9 486 40 102 00 <br /> <br /> i 0130 CONCRETE PUMPING $0.20 SQFT 2,324.000 $464.80 0.000 $O.OD 0.000 $0.00 0.00 <br /> 0140 1 1/2"-0 AGGREGATE BASE $20.00 CUYD 43.000 $860.00 0.000 $D.00 0.000 $0.00 0.00 <br /> 0150 4 INCN CONC WALK $8.00 SQPT 25.000 $200.00 0.000 $0.00 39.300 $314.40 257.00 <br /> <br />