Run Date: 6/30(2006 <br /> Page 1 <br /> City of Eugene <br /> Bid Tabulatioa <br /> 3006-000018 <br /> Job No. 93-004388 <br /> Golden Gardens Park Bridge over the A-2 Channel <br /> Engineer's Estimate Tom Ayres General Contr. Jeff Carter Contt Inc Triton Group. Inc. <br /> Line <br /> 12 Description Quantity Unit Unit Price unt Unit Price Amount Unit Price Amount Unit Price Amount <br /> 10 MOBILIZATION 1 LUMPSUM $17,500.00 $17,500.00 $17,500.00 $17,500.00 $20,000.00 $20,000.00 $21,000.00 $21,000.00 <br /> 20 TEMP. PROTECTION AND DIRECTION OF TRAFFIC 1 LUMPSUM $1,000.00 $1,000.00 $1,500.00 $1,500.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 <br /> 30 TEMPORARY SIGNS 66 SQFT $16.00 $1,056.00 $30.00 $1,480.00 $17.00 $1,122.00 $25.00 $1,650.00 <br /> 40 TEMPORARY BARRICADES, TYPE III 2 EACH $113.00 $226.00 $125.00 $250.00 ~ $175.00 $350.00 $250.00 $500.00 <br /> 50 TEMPORARY PLASTIC DRUMS 6 EACH $41.00 $246.00 $40.00 $240.00 $50.00 $300.00 $120.00 $720.00 <br /> 60 FLAGGERS 32 HOUR $35.00 $1,120.00 $40.00 $1,280.00 $38.00 $1,216.00 $43.00 $1,376.00 <br /> 70 EROSION CONTROL 1 LUMPSUM $1,000.00 $1,000.00 $2,500.00 $2,500.00 $1,000.00 $1,000.00 $1,850.00 $1,850.00 <br /> 80 CHECK DAMS 1 EACH $100.00 $100.00 $150.00 $150._00 $300.00 $300.00 $500.00 $500.00 <br /> 90 CONSTRUCTION ENTRANCES 1 EACH $950.00 $950.00 $1,000.00 $1,000.00 $750.00 $750.00 $2,000.00 $2,000.00 <br /> 100 SEDIMENT FENCE, UNSUPPORTED 76 FOOT $9.00 $684.00 $3.00 $228.00 $5.00 $380.00 $5.00 $380.00 <br /> 110 COMPOST FILTER BERM 1205 FOOT $3.00 $3,615.00 $7.50 $9,037.50 $1.25 $1,506.25 $2.25 $2,711.25 <br /> 120 POLLUTION CONTROL PLAN 1 LUMPSUM $200.00 $200.00 $1,500.00 $1,500.00 $500.00 $500.00 $500.00 $500.00 <br /> 130 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 1 LUMPSUM $200.00 $200.00 $500.00 $500.00 $2,500.00 $2,500.00 $1,500.00 $1,500.00 <br /> 190 REMOVAL OF GUARDRAIL 40 FOOT $5.00 $200.00 $10.00 $400.00 $17.00 $680.00 $15.00 $600.00 <br /> 150 CLEARING AND GRUBBING 1 LUMPSUM $880.00 $880.00 $2,500.00 $2,500.00 $3,000.00 $3,000.00 $2,000.00 $2,000.00 <br /> 160 GENERAL EXCAVATION 41 CUYD $15.00 $615.00 $25.00 $1,025.00 $25.00 $1,025.00 $75.00 $3,075.00 <br /> 170 SUBGRADE GEOTEXTILE 320 SQYD $1.00 $320.00 $3.00 $960.00 $1.00 $320.00 $2.00 $640.00 <br /> 180 LOOSE RIPRAP, SPECIAL CLASS 200 22 TON $50.00 $1,100.00 $50.00 $1,100.00 $40.00 $880.00 $175.00 $3,850.00 <br /> 190 BRIDGfi REMOVAL WORK 1 LUMPSUM $500.00 $500.00 $5,000.00 $5,000.00 $2,500.00 $2,500.00 $1,750.00 $1,750.00 <br /> 200 STRUCTURE EXCAVATION 1 LUMPSUM $2,000.00 $2,000.00 $1,500.00 $1,500.00 $4,000.00 $4,000.00 $4,500.00 $4,500.00 <br /> 210 GRANULAR STRUCTURE BACKFILL 1 LUMPSUM $750.00 $750.00 $1,000.00 $1,000.00 $5,000.00 $5,000.00 $3,500.00 $3,500.00 <br /> 220 FURNISH PILE DRIVING EQUIPMENT 1 LUMPSUM $15,000.00 $15,000.00 $9,500.00 $9,500.00 $15,500.00 $15,500.00 $9,500.00 $9,500.00 <br /> 230 FURNISH PP 12.75 X 0.375 STEEL PILES 320 FOOT $45.00 $14,400.00 $32.00 $10,240.00 $30.00 $9,600.00 $34.00 $10,880.00 <br /> 240 DRIVE PP 12.75 X 0.375 STEEL PILES 8 EACH $800.00 $6,400.00 $250.00 $2,000.00 $1,500.00 $12,000.00 $500.00 $4,000.00 <br /> 250 PP 12.75 X 0.375 STEEL PILE SPLICES 2 EACH $200.00 $400.00 $250.00 $500.00 $1.00 $2.00 $350.00 $700.00 <br /> 260 REINFORCEMENT 1 LUMPSUM $5,500.00 $5,500.00 $3,500.00 $3,500.00 $5,000.00 $5,000.00 $7,862.75 $7,862.75 <br /> 270 STRUCTURAL CONCRETE, CLASS 3600 1 LUMPSUM $12,600.00 $12,600.00 $12,500.00 $12,500.00 $18,000.00 $18,000.00 $20,000.00 $20,000.00 <br /> 280 26 INCH PRECAST PRESTRESSED SLABS 288 FOOT $180.00 $51,840.00 $220.00 $63,360.00 $200.00 $57,600.00 $225.00 $64,800.00 <br /> 290 3 TUBE STEEL RAIL 1 LUMPSUM $25,760.00 $25,760.00 $29,500.00 $29,500.00 $24,000.00 $24,000.00 $31,000.00 $31,000.00 <br /> 300 AGGREGATE BASE 203 TON $15.00 $3,045.00 $18.00 $3,654.00 $19.00 $3,857.00 <br /> $30.00 $6,090.00 <br /> 310 PERMANENT SEEDING, METHOD 1 OR 2 0.2 ACRE $1,500.00 $300.00 $4,000.00 $800.00 $1,000.00 $200.00 $3,625.00 $725.00 <br /> 320 ACCESS GATE 1 EACH $5,000.00 $5,000.00 $2,000.00 $2,000.00 $4,000-00 $4,000.00 $4,000.00 $4,000.00 <br /> 330 CONSRUCTION ZONE FENCING 740 FOOT $2.50 $1,850.00 $3.50 $2,590.00 $1.50 $1,110.00 $1.00 $740.00 <br /> <br /> Total: <br /> $176,357.00 $191,394.50 $199,198.35 $315,900.00 <br /> a <br /> <br />