Proposal Cost Breakdown Supplemental Sheet <br /> Cumulative <br /> Quantity Units Rate Subtotals Total <br /> 09 Norkenzie from Green Acres to Beltline Bridge 1,293 feet Cores 3 <br /> On Site FWD resting and Coring FWD 26 <br /> FWD Unit (includes staff engineer) 0.25 each S 1,500.00 S 375.00 <br /> Staff Engineer III (core logging) 4.00 hours S 103.00 3 412.00 <br /> Flagging Subcontractor (includes 1296 markup) 0.70 each S 750.00 S 525.00 <br /> Drilling Subcontractor (includes 12% markup) 0.40 each S 1,250.00 S 500.00 <br /> Data Reduction and Analysis <br /> Project Engineer 4.50 hours S 113.00 S 508.50 <br /> Laboratory Testing <br /> Moisture Content 3.00 each S 12.00 S 36.00 <br /> Wash Sieve Analysis 1.00 each S 80.00 S 80.00 <br /> Atterberg Limits 0.00 each S 105.00 S - <br /> Repori Preparation <br /> Principal Engineer (review) 1.50 hour S 159.00 S 238.50 <br /> Project Engineer 5.50 hours S 113.00 S 621.50 <br /> Drafting 2.50 hours S 83.00 S 207.50 <br /> Project Assistant 3.00 hours S 72.00 S 216.00 <br /> Support Staff 1.00 hours S 55.00 S 55.00 <br /> Subtotal S 3,775.00 S 74,740.00 <br /> ri <br /> <br /> ~~ESIGN~ Attachment Eugene-7-01:051606 <br /> <br />