Proposal Cost Breakdown Supplemental Sheet <br /> Cumulative <br /> Quantity Units Rate Subtotals Total <br /> 06 East Amazon Parkway from Hilyard to Dillard 5,782 feet Cores 10 <br /> On Site FWD testing and Coring FWD 1 16 <br /> FWD Unit (includes staff engineer) 0.75 each S 1,500.00 S 1,125.00 <br /> Staff Engineer III (core logging) 13.00 hours S 103.00 S 1,339.00 <br /> Flagging Subcontractor (includes 12% markup) 2.20 each S 750.00 S 1,650.00 <br /> Drilling Subcontractor (includes 12% markup) 1.80 each S 1,250.00 S 2,250.00 <br /> Data Reduction and Analysis <br /> Project Engineer 10.00 hours S 113.00 S 1,130.00 <br /> Laboratory Testing <br /> Moisture Content 11.00 each S 12.00 S 132.00 <br /> Wash Sieve Analysis 3.00 each S 80.00 S 240.00 <br /> Atterberg Limits 2.00 each S 105.00 S 210.00 <br /> Report Preparation <br /> Principal Engineer (review) 2.00 hour S 159.00 S 318.00 <br /> Project Engineer 11.00 hours S 113.00 S 1,243.00 <br /> Drafting 5.00 hours S 83.00 S 415.00 <br /> Project Assistant 5.00 hours S 72.00 S 360.00 <br /> Support Staff 2.00 hours S 55.00 S 110.00 <br /> Subtotal S 10,522.00 S 57,037.50 <br /> 07 Hawkins Lane from 18th to 100-feet South of Videra 6,241 feet Cores 10 <br /> On Site FWD testing and Coring FWD 166 <br /> FWD Unit (includes staff engineer) 0.80 each S 1,500.00 S 1,200.00 <br /> Staff Engineer III (core logging) 13.00 hours S 103.00 S 1,339.00 <br /> Flagging Subcontractor (includes 129E markup) 2.30 each S 750.00 S 1,725.00 <br /> Drilling Subcontractor (includes 12% markup) 1.60 each S 1,250.00 S 2,000.00 <br /> Data Reduction and Analysis <br /> Project Engineer 10.00 hours S 113.00 S 1,130.00 <br /> Laboratory Testing <br /> Moisture Content 11.00 each S 12.00 S 132.00 <br /> Wash Sieve Analysis ~ 3.00 each S 80.00 S 240.00 <br /> Atterberg Limits 2.00 each S 105.00 S 210.00 <br /> Report Preparation <br /> Principal Engineer (review) 2.00 hour S 159.00 S 318.00 <br /> Project Engineer 12.00 hours S 113.00 S 1,356.00 <br /> Drafting 5.00 hours S 83.00 S 415.00 <br /> Project Assistant 5.00 hours S 72.00 S 360.00 <br /> Support Staff 2.00 hours S 55.00 S 110.00 <br /> Subtotal S 10,535.00 S 67,572.50 <br /> 08 Jefferson from West 5th to West 7th Avenue 761 feet Cores 2 <br /> On Site fWD resting and Coring FWD 15 <br /> FWD Unit (includes staff engineer) 0.20 each S 1,500.00 S 300.00 <br /> Staff Engineer III (core logging) 3.00 hours S 103.00 S 309.00 <br /> Flagging Subcontractor (includes 12X markup) 0.80 each S 7'50.00 S 600.00 <br /> Drilling Subcontractor (includes 12% markup) 0.30 each S 1,250.00 S 375.00 <br /> Data Reduction and Analysis <br /> Project Engineer 4.00 hours S 113.00 S 452.00 <br /> Laboratory Testing <br /> Moisture Content 3.00 each S 12.00 S 36.00 <br /> Wash Sieve Analysis 1.00 each S 80.00 S 80.00 <br /> Atterberg Limits 0.00 each S 105.00 S - <br /> Report Preparation , <br /> Principal Engineer (review) 1.50 hour S 159.00 S 238.50 <br /> Project Engineer 5.00 hours S 1 13.00 S 565.00 <br /> Drafting 2.00 hours S 83.00 S 166.00 <br /> Project Assistant 3.00 hdUrs S 72.00 S 216.00 <br /> Support Staff 1.00 hours S 55.00 S 55.00 <br /> Subtotal S 3,392.50 S 70,965.00 <br /> <br /> ®~ESIGIV= Attachment Eugene•7-01:051606 <br /> <br />