New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4383 Environmental Solutions Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4383 Environmental Solutions Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:52:50 PM
Creation date
6/16/2008 2:18:52 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004383
GL_Project_Number
965165
Identification_Number
2006100321
COE_Contract_Number
2006-00226
Retention_Destruction_Date
1/2/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The estimated fees for completion of the Wetland Delineation study and the Joint Removal-Fill Permit <br /> Application are presented in detail below. The estimated costs are presented as a range based on variables <br /> typically associated with a project such as this, including level of proposed development. The anticipated <br /> costs are based on typical site conditions in the vicinity of the project, and will be billed as time and <br /> materials expenses for completion of the project. Should the site conditions differ significantly from <br /> normal conditions or the scope of the project change from what is outlined above such that additional <br /> costs would be incurred, this proposal can be amended with written agreement from the City of Eugene <br /> and Environmental Solutions LLC. <br /> 1. Completion of Wetland Delineation <br /> Field Investigation: 20-60 hrs biologist and assistant* $2400.00- $7200.00 <br /> Data sheets and report preparation: 24-40 hrs biologist $1920.00- $3200.00 <br /> Mapping: 16-24 hrs cartographer $800.00-$1200.00 <br /> <br /> ' Misc. coordination (with city, DSL, Corps as needed): 8 hrs biologist ..............................................$640.00 <br /> Materials and Expenses (including aerial photo, historic aerial photos, copies) ................................$45U.00 <br /> Estimated cost range of Wetland Delineation $6210.00. $12,690.00** (not to exceed) <br /> * this equates to a minimum of 2 days in the field with up to 3 field visits at 2 days per field visit as <br /> described in Scope <br /> **dces not include cost of professionally surveying wetland boundaries and plots <br /> 2. Completion of JPA <br /> Preparation of Permit application (including HGM assessment): <br /> 32-48 hours biolog-ist $2560.00-$3840.00 <br /> Rare plant survey and assessment report: 20-30* hrs biologist $1600.00-$2400.00 <br /> Mapping: 24 hrs cartographer ..........................................................................................................$1200.00 <br /> Coordination (includes meetings with Eugene, DSL, Corps): 4-8 hrs biologist $320.00-640.00 <br /> Materials and Expenses ......................................................................................................................$300.00 <br /> Estimated cost range of JPA .........................................................».....$5980.00-$8380.00 (not to exceed) <br /> * may require 2 site visits if it is determined that there is a potential for rare plant species <br /> 5.0 SCHEDULE <br /> Completion of the wetland delineation is estimated in 45 days. Preparation of the Joint Removal-Fill <br /> Permit Application is estimated to be completed within 60 days. Fees .and expenses will be billed monthly <br /> according to the rates and terms outlined in the Natural Resources Contract that Environmental Solutions <br /> LLC has with the City of Eugene. This agreement may not be changed without the prior written consent <br /> of the parties. This proposal, its terms and conditions, may not be assigned without the prior written <br /> consent of the other party. The terms of this proposal are effective for 90 days from the date of <br /> preparation, as shown on the front page of this letter. <br /> Please contact me if you have any questions concerning the proposed scope of work or fees. Thank you <br /> for this opportunity and I look forward to working with you. <br /> Sincerely, <br /> Nancy Holzhauser, Ecologist <br /> } <br /> Environmental Solutions LLC: Proposal for the City of <br /> Eugene <br /> Wetland Consulting Services: Roosevelt Blvd. Extension- Royal Nodal Development Section, Eugene, Oregon <br /> February 2006 Page 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.