New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4400 Balzhiser & Hubbard Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4400 Balzhiser & Hubbard Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 10:10:50 PM
Creation date
6/13/2008 3:43:57 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004400
GL_Project_Number
965216
Identification_Number
2006100349
COE_Contract_Number
2006-00230
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Eugene PWE February 9, 2006 <br /> Larane Channel LOMR Revised February 24, 2006 <br /> 2. Civil <br /> a. Attend one design team meeting. <br /> b. Coordination with City and FEMA <br /> c. Research of record documentation (as-builts, drainage studies) <br /> d. Preparation of FEMA Form MT-2 <br /> 1) Project description narrative. <br /> 2) Hydraulic calculations using step-backwater analysis. <br /> 3) Establishment of new floodplain boundaries within relocated portion of drainage <br /> channel. <br /> e. Documentation <br /> f. Prepare a draft FIRM showing proposed floodplain boundary limits. <br /> g. Submit documentation to FEMA and City of Eugene (one copy each). <br /> G. Deliverables <br /> 1. LOMR Application packet (1 copy) <br /> 2. Topographic survey (electronic Auto CAD file) <br /> 3. Modeling data <br /> H. Proposed Fees <br /> Balzhiser & Hubbard Engineers will provide the above-defined services on an hourly basis <br /> not to exceed the max fee below. We have included our current rate schedule for your <br /> reference. Reimbursable expenses (mileage, reproduction) will be billed at cost and are not <br /> included in the maximum fee. Not included in our fee are the following direct expenses. <br /> FEMA review fees to be paid by the City directly. <br /> Survey .........................................................................$1,800 <br /> Civil ..............................................................................$7,800 <br /> Total Max Fee .............................................................$9,600 <br /> Balzhiser & Hubbard Engineers' hourly rates are as follows: <br /> Principal $125 /hour <br /> Department Manager $95 /hour <br /> Project Manager $80-$92 /hour <br /> Engineer $62-$75 /hour <br /> Designer $62-$75 /hour <br /> CAD Manager $69 /hour <br /> CAD Operator $55-$62 /hour <br /> Clerical $42 /hour <br /> Survey-Field Crew: <br /> 2-Man $95 /hour <br /> 3-Man $125 /hour <br /> Proposed by: <br /> Monica B. Anderson, P.E. <br /> Vice President <br /> N:lcivil~proposallCOE Larane LOMR Itr pro mds 060209.doc <br /> <br /> /,I BALZHISER ~t HUBBARD ENGINEERS PROPOSAL-CIVIL-PAGE3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.