Run Date: 12/14/2007 08:48:01 - Page 3 <br /> City of Eugene <br /> Contract Preliminary Progreso Payment <br /> Payment NO : 005 <br /> Contractor: BUGSNS SAND & GRAVEL Original Contract: $1,186,499.10 <br /> Job 93-004341 Current Amount: $1,236,470.67 <br /> Contract No: 2007-00026 Contract Award Date: 06/25/2007 <br /> Po 20o71ooa21 completion Date: 11/01/2007 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals k Complete <br /> Line Description Last Chag Ord Unit Price Unit Measure Quantity Amount tit Amount Quantity Amount <br /> 0200 12 INCH 8D PVC PIPS 5100.00 FOOT 7.000 $700.00 0.000 50.00 57.OD0 $5,700.00 814.00 <br /> 0210 PIPS TEES 10 INCH $300.00 EACN 1.000 $300.00 0.000 $0.00 1.000 $300.00 100.00 q <br /> 0220 RSMJRSPL CATCHBASIN W/HIKE PRO $1,500.00 SACK 1.000 $1,500.00 0.000 $0.00 1.000 $1,500.00 100.00 3 <br /> i <br /> 0230 CURB INLET 4 A $1,800.00 EACH 3.000 $5,400.00 0.000 $0.00 3.000 $5,400.00 100.00 <br /> oz4o CATCH BASIN TRAP $soo.oo EACH a.ooo $l,ooo.oo o.ooo $o.oo l.ooo $soo.oo so.oa a <br /> i <br /> 0250 ADNSTING BOXES $300.00 EACH 2.000 $600.00 0.000 $0.00 2.000 $600.00 100.00 <br /> z <br /> 0251 MAJOR ADJ. MH 5471 002 $1,663.62 LUMPSUM 1.000 $1,663.62 1.000 $1,663.62 1.000 $1,663.62 100.00 <br /> 0260 MINOR ADJUSTMENT OF MANHOLES S1 000.00 HACH 16.000 $16 000.00 0.000 $0.00 16.000 $16,000.00 100.00 <br /> 0270 MH REM/RHPL FRAME/COVER-WW $250.00 EACH 13.000 $3,250.00 0.000 $0.00 8.000 $2,000.00 62.00 <br /> 0280 NE RE![/REPL FRANH/COVER-ST $250.00 fACN 3.000 8750.00 0.000 S0.00 7.000 51,750.00 233.00 - <br /> 0290 TRENCH GRATE $150.00 SQPT 30.000 $4,500.00 0.000 $0.00 30.000 $4,500.00 100.00 <br /> 0300 PLUG SX. PIPE END WITH CONCRET $100.00 HACH 2.000 5200.00 0.000 $0.00 2.000 $200.00 100.00 <br /> 031D RETALNING WALL, MSS $21.00 SQFT 870.000 $18,270.00 309.000 $6,489.00 840.000 $17,640.00 97.00 <br /> 0320 COLD PLANS PVMT REMOVAL, 2• D $0.50 SQFT 26,910.000 $13,455.00 0.000 $0.00 41,903.000 $20,951.50 156.00 <br /> z <br /> 0330 COLD PLANS PVNT RBI40VAL, 4^ DB $0.50 SQFT 44,619.000 $22,309.50 0.000 $0.00 33,654.000 $16,827.00 75.00 <br /> i <br /> i <br /> 0340 COLD PLANS PVMT REMOVAL, VARIA $0.40 SQPT 43,370.000 $17,348.00 0.000 $0.00 42,744.000 $17,097.60 99.00 <br /> 0350 COLD PLANS PVMT REMOVAL, 0" TO $0.50 SQFT 8,520.000 $4,260.00 0.000 $0-00_.4,350.000 $2,175.00 51.00 <br /> 0360 1 1/2• - 0• AacaesoATH BASS $20.00 TON 110.000 $a,2oo.00 0.000 50.00 305.200 $6,104.00 277.00 <br /> 7 <br /> 0370 LSVHL 2, 3/8 IN DSNSS RMAC $75.00 TON 245.000 $18,375.00 0.000 $0.00 0.000 $0,00 0.00 <br /> 0380 LEVEL 2 1/2 IN DENSE HMAC $50.00 TON 2,280.000 $114,000.00 0.000 $0.00 2,253.800 $112,690.00 99.00 <br /> s <br /> 0390 PLAIN CONCRETE PVMT, UNDOWELHD $7.00 SQFT 4,850.000 $33,950.00 0.000 $0.00 2,593.000 $18,151.00 53.00 <br /> 0400 PLAIN CONCRETE PVMT, DOWELED, $17.00 SQPT 55.000 $935.00 0.000 $0.00 50.200 $853.40 91.00 <br /> 0401 CONST RSINFORCHD DWY 001 $7.94 SQPT 371.000 $2 945.74 0.000 $0.00 371.000 $2 945.74 100.00 j <br /> 0410 CONCRSI'H CURBS $18.00 POOT 814.000 $14,652.00 0.000 $0.00 771.700 $13,890.60 95.00 1 <br /> <br /> • i <br /> i <br /> i <br /> <br />