i <br /> Page 2 <br /> <br /> Run Date: 12/14/2007 08:45:01 <br /> , City of btigene <br /> Contract Preliminary Progtess Paymeat <br /> Pays:aat No : 005 <br /> Contractor: BUOBNB 9AND b GRAVBL Original Contract: $1,186,499.10 <br /> Job 93-004341 Cnrreat Amount: $1,236,470.67 <br /> Contract No: 1007-00026 Contract Award Date: 06/25/2007 <br /> YO 2007100421 Completion Date: 11/01/2007 <br /> Assessable: No <br /> " Current Contract Bstimated Payment Cumulative Totals 1 Complete <br /> I.iae Description Laat Cling Ord Uait Price Unit Measure Quantity Amount uaatitY Amount Quant itY Amount <br /> PPP E 18TH7 AGATE ST - HILYARD 8Y <br /> peaaral <br /> 0000 Liquidated Damages E. 18th/Ago ($500.00) DAY 0.000 $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION $50,000.00 LUMPSUM 1.000 $50,000.00 0.000 50.00 1.000 550,000.00 100.00 <br /> 0020 TEMP NORK ZONE TRAFFIC CONTRO $16 500 00 LUMPSUM 1 000 $16 500.00 0.000 $0 00 1.000 $16 500.00 100.00 ~ <br /> 0021 CONSTRUCTION FENCING 001 $1.75 LINFT 252.000 $441.00 0.000 $0.00 252.000 $441.00 100.00 { <br /> } <br /> 0030 TEMPORARY STRIPIlXi $1,500.00 LUMPSUM 1.000 $1,500.00 0.000 $0.00 1.000 $1,500.00 100.00 <br /> 0040 PLAGGBR3 $40 00 HOUR 500 000 $20 000.00 0.000 $0.00 556.500 $22,260.00 111.00 <br /> 0050 CITY PROVIDED SPEC INFO SIGNS $200.00 EACH 4.000 $800.00 0.000 $0.00 4.000 $800.00 100.00 <br /> 0060 EROSION CONTROL $4,000.00 LUMPSVM 1.000 $4,000.00 0.000 $0.00 1.000 $4,000.00 100.00 <br /> 0070 TRBH PROTECTION $1 000 00 LUMPSUM 1 000 $1 000.00 0.000 $0 00 1.000 $1,000.00 100.00 <br /> 0080 TRBB RBlIOVAL $400.00 EACH 12.000 $4,800.00 0.000 $0.00 12.000 $4,800.00 100.00 <br /> 0090 FENCE, RHIIDiti $3.00 LII(FT 240.000 8720.00 0.000 $0.00 301.000 $903.00 125.00 <br /> i <br /> 0100 RBMDVB PARXIIiG MBTER POST $40 00 BACR 22 000 $880.00 0.000 50.00 22.000 $880.00 100.00 <br /> 0110 REMOVE AND SALVAGE SIW1 $50.00 EACH 2.000 $100.00 0.000 $0.00 6.000 $300.00 300.00 d <br /> 7 <br /> 0120 RBMDVS cATCx BASIN S1so.oo Bach 1.000 Slso.oo 0.000 50.00 1.000 $150.00 loa.oo <br /> F <br /> 0130 ALTER 8X PSNCB POST BASS $20 00 EACH 81 000 $1 620.00 0.000 $0.00 46.000 $920.00 57.00 ~ <br /> 0131 MODIFY SIDEWALK 002 $665.28 LUMPSUM 1.000 $665.28 1.000 $665.28 1.000 $665.28 100.00 <br /> 0140 15 IN. 90RPACINO BTAHILIZATION $100.00 CUYD 1.500 $150.00 0.000 $0.00 2.300 $230.00 153.00 ~ <br /> 0150 17 IIi. SDRPACINO BTASILIE7ITIOR $75.00 COYD 76.000 $5,700.00 0.000 $0.00 124.100 $9,307.50 163.00 <br /> 0160 G8NiRAI. EXCAVATION $10.00 CUED 610.000 824.400.00 0.000 $0.00 1,114.300 $44,972.00 184.00 <br /> 0170 3 INCH SD PVC PIPE $5.00 FOOT 32.000 $160.00 0.000 $0.00 41.000 $205.00 128.00 <br /> 0180 10 INCH SD PVC PIPE $80 00 FOOT 52 000 $4 160 00 0.000 $0.00 0.000 _ 50.00 0.00 1 <br /> i <br /> 0190 10 INCH SD C900 PIPS $105.00 FOOT 23.000 $2,415.00 0.000 $0.00 23.000 $2,415.00 100.00 <br /> 1 <br /> <br />