Page 6 <br /> <br /> Run Date: 04/04/2008 15:04:39 City of Eugene <br /> Contract Preliminary Progress Payment <br /> - Payment No 008 Final Pay <br /> Contractor: EUGENE SAND & GRAVEL Original Contract: $1,106,499.10 <br /> Current Amount: $1,373,019.57 <br /> Job k: 93-004422 <br /> Contract No: 2007-00026 Contract Award Date: 06/25/2007 <br /> PO 2007100421 Completion Date: 11/01/2007 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals 8 Complete <br /> Last Chn Ord Uait Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> Line Description g <br /> 0800 CITY PROVIDED SPEC INFO SIGNS $200.00 EACH 4.000 $800.00 0.000 $0.00 4.000 $800.00 100.00 <br /> 0810 EROSION CONTROL $2,500.00 LUMPSUM 1.000 $2,500.00 0.000 $0.00 1.000 $2,500.00 100.00 <br /> 0820 REMOVAL OP INLETS $150.00 EACH 2.000 $300.00 0.000 $0.00 3.000 $450.00 150.00 <br /> 0830 REMOVAL OF PIPES $10.00 FOOT 260.000 $2,600.00 0.000 $0.00 150.000 $1,500.00 58.00 <br /> 0840 12 IN. SURFACING 9TABILIZATION $120.00 CVYD 140.000 $16,800.00 0.000 $0.00 197.800 $23,736.00 141-00 <br /> 0850 13 IN. 3i1RFACING STABILIZATION $120.00 CUYD 8.000 $960.00 0.000 $0-00 13.400 $1,608.00 168.00 <br /> 0360 17 IN. SURFACING STABILIZATION $40.00 CUYD 271.000 $10,840.00 0.000 $0.00 283.600 $11,344.00 105.00 <br /> 0870 10 INCH C900 STORM PIPE $90.00 POOT 330.000 $29,700.00 0.000 $0.00 397.000 $35,730.00 120.00 <br /> 0880 10 INCH PVC STORM PIPE $100.00 FOOT 66.000 $6,600.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0890 15 INCH CONCRETE SEALED JOINT $100.00 FOOT 50.000 $5,000.00 0.000 $0.00 53.000 $5,300.00 106.00 <br /> 0900 18 INCH PVC STORM PIPE $110.00 FOOT 10.000 $1,100.00 0.000 $0.00 10.000 $1,100.00 100.00 <br /> 0910 24 INCH PVC STORM PIPE $150.00 FOOT 45.000 $6,750.00 0.000 $0.00 50.000 $7,500.00 111.00 <br /> 0911 48" PIPE W/MANHOLE 003 $127,874.14 LUMPSUM 1.000 $127,874.14 0.000 $0.00 1.000 $127,874.14 100.00 <br /> 0920 PI Pfi TEES, 10 INCH $600.00 EACH 1.000 $600.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0930 CONCRETE CLOSURE COLLARS $850.00 EACH 1.000 $850.00 0.000 $0.00 1.000 $850.00 100.00 <br /> 0940 CONCRETE MANHOLE, FLAT TOP $2,750.00 EACH 3.000 $8,250.00 0.000 $0.00 3.000 $8,250.00 100.00 <br /> 0950 CONCRETE INLETS, TYPE 4A $1,700.00 EACH 2.000 $3,400.00 0.000 $0.00 2.000 $3,400.00 100.00 <br /> 0960 CATCB BASINB, N/SIKH DROOP GRA $1,350.00 EACH 2.000 $2,700.00 0.000 $0.00 3.000 $4,050.00 150.00 <br /> 0970 REM/REPL CONCRETE CATCH BASIN $1,350.00 EACH 5.000 $6,750.00 0.000 $0.00 3.000 $4,050.00 60.00 <br /> 0980 ADJUSTING BOXES $350.00 EACH 5.000 $1,750.00 0.000 $0.00 4.000 $1,400.00 80.00 <br /> 0990 FILLING ABANDONED STRUCTURES $450.00 EACH 4.000 $1,800.00 0.000 $0.00 4.000 $1,800.00 100.00 <br /> 1000 FILLING 11BANDODTBD PIPH9 $150.00 CVYD 52.000 $7,800.00 0.000 $0.00 80.500 $12.L75.0A 155.00 <br /> 1010 PLUG 8E. PIPB SND NITH CONCRHT $100.00 BACB 6.000 $600.00 0.000 $0.00 10.000 $1,000.00 167.00 <br /> 1011 REMOVE CONCRETE PLUG 002 $682.06 LUMPSUM 1.000 $682.06 0.000 $0.00 1.000 $682.06 100.00 <br /> <br />