<br /> 03/05/2008 16:01 FAif 541 682 5366 CITY EU6EHE P'~ EHQ IILDISH CONSTRUC ~003l02Q~,D <br /> modified to elimizsata damage. If the Contractor's method aondnues to damage the CTB, the <br /> contractor shall replace entire CTB sections matching the proposed joint pattern. CT8 damage <br /> is defined as actions that reduce the total thickness to less than S inches, or methods that cause <br /> cracking in the C'TA. No additional payment or contract time will be allowed for rcplaeing <br /> damaged CTH." <br /> (ADD) SECTION 101-2.1 EQiTIPMENT. Add co the end of the paragraph "'The Contractor shall <br /> make modifications to equipment and/or technique if their operations are causing FO>a to <br /> scatter or fling beyond the limits of the project." <br /> (CHANCE) , SECTION 102 HIGH FREQUENCY DEMOY,YTION. Change paragraph numerals "101- <br /> 4.1"end "101-5.1" to "102-4.1" and "102.5.1", respectively. <br /> (ADD) SECTION 541-2.1 AGGR)EOAT~S. Before the first paragraph, add "Aggrogates sources <br /> shall be tested for potentially reactive aggregates according to ASTM Cx95. Sources that <br /> indicate potential reactivity shall either not be used or shall be further tested as described <br /> below." <br /> (CHANGE) SECTION 501.3.1 PROPOR'TYCINS. In the Srst paragraph, charl$c "620" to "600". Tn the <br /> last senttnce of the last paragraph, change " <br /> 2 inches" to "3 inohes". <br /> (ADD) SECTION 501-~1.1 e. CONCRETE SAWS. Add to end of paragraph "F.quipnatnt for sawing <br /> joints and for other similar sawing of concrete must be mounted ott a whvclCd-ahassis~ which <br /> can be easily guided to followed the required alignment." <br /> (Apll) SECTION 501-4.1 g. HAND PLACIIYG CONCRETE. Add "A roller tube will not be <br /> considered adequate to meet this requirement." <br /> (ADD) sECTYON 501-4.11 Fl':NAL STRIKE-OFF, CONSOLIDATYON, AND FINISHING. Add <br /> before the first paragraph "Lack of consolidation or segregation of fine and coarse. aggregates <br /> shall be cause for removal of the affected concrete pavement panels. Pavement panels with <br /> more thaw 1/$ inch ccz~unt paste {lacking sufl~icient coarse aggregate) on the surface shall be <br /> rerrncved and replaaod at no cost to the owntr in acoordanca with section 501.4.19. The <br /> Engineer will determine the depth of the cement paste." <br /> (C]EIANGI~ SIECTION 501-4.1$ OPENING TO TRAFFIC. Change "620" to "600". <br /> (ADD) SEC1'1[ON 501-S.i a. (1) Sampling. Add to the beginning of the first paragraph "Concrete <br /> sample point will bo from the start of the scco~d third of the truck load. The Engineer may take <br /> additional samples from any looation and from any portion of any tn~ok load." <br /> (ADD) SECTION 501-S.i a. (3) Caring. Add to the end of the paragraph "After at least 24 hours of <br /> on site curing, but not more than 48 hours, the Contractor shall transport the beams to the <br /> Agency's testing facility. The Contractor shall remove the beams from their molds at the <br /> facility. The Engineer may designate an agezticy representative to aaaompany the beams during <br /> transportation." <br /> (ADD) SECTION 501-8.2 a. CenerAl. Add "(7) Consolidation of Cor~cretc" and "(8) Homoganaous <br /> Distn'bution of Aggregate". <br /> (REPLACE) SECTION 501-63 CONTROL GHART'S. Replace the CONTROL CHART LIMY'1"S table <br /> with the following: <br /> Addendum No.1-Job #4417 Page 2 <br /> <br />