<br /> 03/05/2008 18:01 FAX 541 682 5366 CITY EUBENE Py EHQ + 4ILDISH COHSTRUC ~ 002/02~~,D <br /> Public woks <br /> Englnegring <br /> CNy of Eugene <br /> 244 East Broadway <br /> Eugene, Oregcn 97401 <br /> (b41) 682-6880 <br /> ADDItNDUM NO.1 (641) 882-8410 Fan <br /> TO THE CONTRACT DOCUMENTS AND SPECIFiCATYONS FOR <br /> TERMINAL RAMP RECONSTRUCTION, SECTION 1 <br /> MARCH S, 2008 JOB #4417 BID NUMBER 4 <br /> TO ALT. PLANHOY.DERS: <br /> The following changes shall amend and supplement. the project bidding documents only to the extent <br /> speeifiaally shown and noted. All other conditions sha11 remain the same. <br /> Bidders shall incorporate the effects of these changes in the appropriate bid items included in this addendum and <br /> the total of these bid items then add in the appropriate place on the bid form. <br /> C~ANGIES TO BID SCHLrD ii E <br /> (DELETE) Original Hid Schedule date 02/12/2008 <br /> (A14D) Revised Bid Sohedule dated 03/05/2008 <br /> C~}PjGES TO DAVE ACUI~ <br /> (AELETE) DAVIS BACON -GENERAL DECISION: OR20080002 02108/2008 OR2 <br /> (ADA) DAVIS BACON ~ GENE1tAL DECLSION: OR20080002 02/15/2008 OR2 <br /> CgeNGES TO SPECIFICATIONS <br /> (DELETE) SECTION 20-03 CONTENTS OF PROPOSAL 1~`ORMS. The first paragraph, last sentence. <br /> (CHANGE) SECTION x0-08 IRREGULAR T'TtOPOSALS. In paragraph (a), change "detached" to <br /> "In1881ng". <br /> (ADD) SEC'T'ION 80-08 FAILURE TO COMPLE'T'E ON TIME. In table of Liquidated Damages, <br /> add twa rows; <br /> "Phase II: Service Road, $500 per Day, 72 Consecutive Hours of Phase YI" <br /> "Diacontlnuaus Operations, 5300 per Day, See Revised Construction Operations Plan" <br /> (REPLACTt) CONSTRUG'ITON OPERATIONS PLAN, Replace the Construction Operations Plan with <br /> the attached Revised Construction Operations Plan. <br /> (CHANGE) SECTION T01 SURFACTC PREPARATION. Change paragraph numerals "102~t.1" and <br /> "102-5.1" to "101-4.1" and "101-5.1", respectively. <br /> (ADD) SECTION 101-2.1 EQ>VIPMENT. Add after the second sentence "I#'the Contractor's method <br /> of demolition causes damage to the CTB, the Engineer will require the Contractor's method be <br /> Addendum No.1-Job #4417 Pape 1 <br /> <br />