New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4466 GeoDesign Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4466 GeoDesign Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2011 9:20:07 AM
Creation date
6/11/2008 2:32:10 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004466
GL_Project_Number
975614
COE_Contract_Number
2008-00210
Retention_Destruction_Date
2/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C~ D E SIG N? City of Eugene Contract 2008-00210 <br />Exhibit B <br />)une 22, 2007 <br />Ciry of Eugene <br />Public Works Engineering Division <br />244 E. Broadway <br />Eugene, OR 97401 ~ <br />Attention: Mr. Matt Rodrigues <br />Proposal <br />Pavement Engineering Services <br />Ciry of Eugene PPP Z009 <br />Various Sites <br />Eugene, Oregon <br />GeoDesign Project: Eugene-8-O1 <br />INTRODUCTION <br />GeoDesign, Inc. is pleased to submit this proposal for palvement engineering services for the <br />City of Eugene, Oregon. This proposal is for pavement rehabilitation analysis consisting of falling <br />weight deflectometer (FWD) testing, subsurface explorations, equivalent single-axle load (ESAu <br />calculations, and analysis on the following city streets: <br />• City View Street, from West 18th Avenue to West 28th Avenue (3,922 feet) <br />• High Street, from East 3rd Avenue to East i l th Avenue (3,066 feet) <br />• Hilyard 5treet, fram East Boradway to East 13th Avenue {1,544 feet) <br />• Lincoln Street, from West 23rd to West 30th Avenue (3,644 feet) <br />• East 33rd Avenue, f~om Hilyard Street to Wiliamette Street (2,678 feet) <br />• East 13th Avenue, Kincaid Street to Alder Street (442 feet) <br />• Aider Street, from East 13th to East 18th Avenue (1,953 feet) <br />In addition, we have been asked to provide consulting engineering services for design and review <br />of potential cold in-place recycling on Roosevelt Boulevard. Our recommendations will be based <br />in part on our previously completed pavement design reports'~~. <br />' Pavemenf Design Report, Roasevelt Boulevard RehabifiCatlon, Pavement Design Report, GeoDesign <br />project: Eugene-1-02-06, dated August 4, 2004 <br />' Pavement Design Repori, Roosevelt Boulevard Rehabilitation, Pavement Design Report, GeoDesign <br />project: Eugene•6-02•02, dated May 22, 2006 <br />15575 SW Sequoia Pkwy • Suite 100 i Portland OR 97224 i oR 503.9G8.8787 I Fax 503.9683068 <br />
The URL can be used to link to this page
Your browser does not support the video tag.