~ ~ , <br />1 <br />Public Works <br />Engineering <br />~ <br />~ City of Eugene <br />244 East Broadway <br />Eugene, Oregon 97401 <br />(541) 682-5560 <br />ADDENDUM N0. 2 (541) 682-8410 Fax <br />TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br />AIRPORT AIR CARGO RAMP EXPANSION IMPROVEMENTS <br />AIP PROJECT NO. 3-41-0028-39 AND AIP PROJECT NO. 3-41-0028-40 <br />MAY 24, 2007 JOB #4464 BID NUMBER 8 <br />TO ALL PLANHOLDERS: <br />The following changes shali amend and supplement the project bidding documents only to the extent <br />speciflcally shown and noted. Ail other conditions shall remain the same. <br />Bidders shall incorporate the effects of these changes in the appropriate bid items included in this <br />addendum and the total of these bid items then add in the appropriate place on the bid form. <br />CHANGES TO SPECIFICATIONS <br />(DELETE) SECTION 20-02 PREQUALIFICATION OF BIDDERS. <br />(DELETE) SECTION 20-03 CONTENTS OF PROPOSAL FORMS. The first paragraph, last <br />r~ sentence. <br />(DELETE) SECTION 20-06 EXAMINATION OF DRAWINGS, SPECIFICATIONS, AND SITE. <br /> The second paragraph. <br />(DELETE) SECTION 20-07 PREPARATION OF PROPOSAL. The 3`d and 4`h sentences. <br />(ADD) SECTION 20-07 PREPARATION OF PROPOSAL. "The bidder shall state the price <br /> (written in ink or typed) and the extended line item price for which he proposes to do <br /> each pay item furnished in the proposal. In case of conflict between the unit price and <br /> the extended line item cost, the unit price extended accurately shall govern". <br />(DELETE) SECTION 30-01 CONSIDERATION OF PROPOSALS. The last sentence of the first <br /> paragraph. <br />(ADD) SECTION 30-01 "If a bidder's proposal contains a discrepancy between unit bid price <br />" <br /> and line item total bid price, the unit price extended accurately shall govern. <br />(CHANGE) SECTION 30-06 EXECUTION OF CONTRACT: Change "15" to "7" <br />(CHANGE) SECTION 30-08 FAILURE TO EXECUTE CONTRACT: Change "15" to "7" <br />(DELETE) SECTION 50-17 COST REDUCTION INCENTIVE. Delete entire section. <br />~'.HANGE) SECTION 80-08 FAILURE TO COMPLETE ON TIME. In table of Liquidated <br />"Additi <br />07" t <br />N <br /> ve <br />o <br />Additive Alternate Bid - Phase 2A, December 1, 20 <br />Damages, change <br /> Alternate Bid - Phase 26, December 1, 2007" <br />Addendum No. 2- Job #4464 Page 1 <br />