STANDARD SPECIFICATIONS <br />002 Oregon Standard Specifications for Construction (Oregon Specifications) as issued in June 2002, <br />the 2002 Oregon Standard Drawings (Oregon Drawings), in effect as of April 16, 2007, both as revised <br />Amendment #3 and #4 have been adopted as the Standard Specifications and Standard Drawings for <br />e City of Eugene in accordance with City Code section 7.085. Amendment #3 and #4 is hereby made a <br />:part of the Standard Specifications and Standard Drawings of the City of Eugene as fully and completelyas <br />~~f it were set forth therein. The Standard Specifications, Standard Drawings and all Addenda may be <br />% examined at the Engineering office located at 244 E. Broadway, Eugene, OR 97401. <br />; <br />; <br />/ SUPPLEMENTAL SPECIFICATIONS <br />, <br />, <br />% <br />The section, subsection and drawing numbers of the Supplemental Specifications correlate to the section <br />'~/ and subsection numbers of the 2002 Oregon Standard Specifications and Standard Drawings. <br />00405.44 Trench Foundation <br />(DELETE) from the second paragraph, "according to 00330.43" <br />(ADD) "until each layer is firm and unyielding" <br />00405.46 Backfilling <br />c) Trench Backfill (2) <br />(DELETE) Compaction shall be achieved by use of inechanical vibrators. <br />00745.13 Job Mix Formula (JMF) Requirements <br />' (ADD) "if the JMF is over 2 years old or" to the fourth sentence after the word `Yequired" <br />00745.13(a) Contractor Provided JMF <br />(ADD) to the end of the third sentence "once a year" <br />00745.16(a)(4) Testing Frequency <br />(DELETE) from the first sentence of the first paragraph ", once for each sublot," <br />(ADD) "per the MFTP" <br />(DELETE) from the last sentence of the first paragraph "at least once during each day of production" <br />(ADD) "per the MFTP" <br />00745.16(b)(1) a. General <br />(DELETE) from the second paragraph "on every sublot and" <br />(DELETE) from the second sentence of the seyenth paragraph "two consecutive running average of <br />four" <br />(ADD) "the running average of four consecutive" to the second sentence of the seventh paragraph <br />after the words "show thaY' <br />00745.16(b)(1) c. MDV Requirements at Start-Up <br />(ADD) `bnce per year" after the words ``Perform MDV testing" <br />