;I State the number of project drawing sheets included with this application: <br />A complete application must include a location map, site plan, cross-section drawings and recent aerial photo as follows and as <br />applicable to the project: <br />^ Location map (must be legible with street names) <br />^ Site plan including; <br />o Entire project site and activity areas <br />^ Existing and proposed contours ~ <br />^ Location of ordinary high water, wetland boundaries or other jurisdictional boundaries <br />^ I Identification of temporary and permanent impact areas within waterways or wetlands <br />^ ~-1=.~~c~.xt~~, ~?s° i.~i~~~~;~~~;~~t~;~ and north arrow <br />^ Location of staging areas <br />^ Location of construction access <br />^ Location of cross section(s), as applicable <br />^ Location of mitigation area; if applicable <br />^ Cross section drawing(s) including; <br />^ Existing and proposed elevations <br />:,;~ ~€~.~e11;'~IL'.~:~1~1;I i3~~~t"Yil ?€?~"x1.P`~~3f;7`1T"~'r;.ti~1?~',t~x'~i1~,~~3:5 ~1%~~11]?. l~`~1~~M~~L~'61~~y t1E ~.~"~;~,~i~S~i.~.4 <br />~ .~._ ~ <br />^ Ordinary high water and/or wetland boundary or other jurisdictional boundaries <br />_ . <br />~~........~~f.~~~ :~c~~i~~,.,~?~~._c~i~;~~~~;s~:r~tt,~ <br />_ . ........................ <br />^ Reeent Aerial phc~to (1:200, or if not available for your site, the hi ~h~resolutioii a.vailable) <br />Will any construction debris, runoff, etc., enter a wetland or waterway? ~Yes QNo <br />If yes, describe the type of discharge and show the discharge location on the site plan. <br />It is anticipated that much of the pond bank slopes will be excavated, and therefore disturbed. It is also anticipated that some <br />excavation will occur in submerged conditions. Sedimentation traps will be placed near the outlet of the South pond in the A-2 <br />channel to create entrapment for any sedimentation that has become mobile. Submerged excavation will be done during low <br />water conditions in still water. Monitoring of water turbiditiy will be done daily by observation with photographic <br />documentation. <br />Estimated Project Start Date:Mid June 2007 Estimated Project Completion Date: Construction Late Sentember <br />2007, Ve~etation establishment bv February 2008 because of plant availabilitv <br />Page 4 <br />