New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4474 Environmental Solutions Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4474 Environmental Solutions Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2011 11:37:40 AM
Creation date
6/9/2008 3:22:47 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004474
GL_Project_Number
975152
COE_Contract_Number
2007-00227
Retention_Destruction_Date
3/4/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
available reso~rce information. This report shouid satisfy the DSL and Corps requirements for the Clean <br />Water Act. The Wetland Delineation report will include the following: <br />• Discussion of inethods and techniques <br />"` •, Site map depicting the wettandJupland b~undary and locafiio~i of sample plots <br />~ Aerial photographs as necessary, to indicate changes in the conditions of the site property and <br />vicanity <br />• Fie1d data sheets (US Army Corps of Engineers' format for a three-parameter application} for <br />each sample plot ~ <br />Yau will be provided with three copies of the report unless otherwise requested. <br />3A LIl~IITATIONS TO THE SCOPE <br />The following items are not included within the scope of work far this project: <br />• Wetland Mitigation Plan <br />• Joint Removal-Fill Permit Application <br />• DSL permit application fee, anticipated to be $200-$450 <br />• Corps permit application fee, anticipated to be $100-$250 <br />• Preparation of ather investigations, documents, report~, or presantations which may be requir~d <br />hy local ar other agencies during the cours~ of the project <br />4.0 FEE <br />The estimated fees for completion of the Wetland Delineation study are presented in detail below. The <br />estimated costs are presented as a range based on variables typically associated with a project such as this, <br />with a not-to-exceed amount; billing will be for tinne and materials expenses for completion of the project. <br />Should the scope of the project change from what is outlined above such that additional cQSts would be <br />incurred, this proposal can be amended with written agreement frozn the Ciiy af Eugene and <br />Environmental Solutions LLC. <br />1. ~ompietion of Wetland Delineation <br />Field Investigation: 16-26 hrs ecologist and assistant ....................................... $21b0.00- $3510.00 <br />Data sheets and report preparation: 26-32 hrs ecologist .................................... $23A~O.Q4- $2880.QQ <br />Preparation of H~M assessment (for the ponds only): 4 hrs ecologist .................................$360.00 <br />Mapping: 20 hrs cartographer ..............................................................................................$1000.00 <br />Misc. coordination (city, DSL, Corps): 4 hrs ecologist ................................ $360.00 <br />......................... . <br />Materials and Expenses (mil~age, copies) . ...........................................................................$40U.~0 <br />Estimated cost range of Wetland Delineation ........................... $6620.00- $$510.00*. (not to ezceed) <br />~ does not include cost of professionally surveying wetiand boundaries and plots <br />5.0 SCHEDLTLE <br />Completion of the wetland delineation is estimated in 30 days. Fees and expenses wiil be billed monthly <br />according to the rates and terms outlined in the Natural Reso~rces Contr~et that Environmental Solutions <br />LLC has with the City of Eugene. This agreement may not be changed witlzout the priar written consent <br />of the parties. T'his proposal, its terms and conditions, may not be assigned without the prior written <br />consent of the other party. The terms of this proposal are effective for 90 days frorn the date of <br />preparation, as shown on the front page of this letter. Please contact me if you have any questions <br />concerning the proposed scope of work or fees. Thanic you for this opportunity and I look forward to <br />working with you. . <br />Sineerely, <br />---_.__ <br />Nancy Holzhaus r, Ecologist <br />Ertvironmental Solutians LLC: Proposal for the City ofEugene <br />Wetland Delineation Services: Golden Gardens Park Site, Eugene, OR <br />April 2007 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.