Concrete for 120.000 <br /> Unit QTY Unit Cost Total <br />Mobilization LS 1 $ 8,862 $ 8,862 <br />TPDT LS 1 $ 5,000 $ 5,000 <br />Erosion control LS 1 $ 1,000 $ 1,000 <br />Tree Protection Fencin FT 500 $ 1 $ 500 <br />Excavation CY 167 $ 40 $ 6,667 <br />4" A. Base SY 500 $ 4 $ 2,000 <br />Ad' exst structures EA 8 $ 800 $ 6,400 <br />curb and utter FT 200 $ 70 $ 14,000 <br />8" Concrete SF 4500 $ 10 $ 45,000 <br /> $ 89,429 <br /> <br />En ineerin -23% $ 20,569 <br />Testin $ 1,000 <br />contin enc -10% $ 8,943 <br /> Total = $ 119,941 <br />