SYSTEMS DEUELOPMENT CHARGE EXPENDITURE ALLOCATION WORKSHEET <br />ProjeCt Name: Viilard Street Concrete Panel Replacement <br />Project Manager Name: Chuck Mueller <br />S2rviCe ID #(e.g. Good Job Number 004161): 4557 Contract #(e.g. 2ooa-0sos): Capital Project #(e.y. so52aa): <br />' . SDC Expenditure Requirements <br />(mprovement Fees: May be spent only on capital improvements inciuded in an adopted Capital Improvement Plan that increase capacity needed to <br />provide service for future users, including those that provide new facilities or increase the capacity provided byexisting facilities. <br />Wastewater Eligible: Non-assessable components of projects attributable to future development that drain those portions of pipes within the total area served by <br />the project. [Quanti(y portions of project that are capacity enhancing; pro-rate desigNconstruction management costs on a proportionate 6asis.] <br />Stormwater Eligible: Non-assessable components of pipe or open channel projects attributable to future development that drain impervious surface areas within <br />the total drainage basin served by the project. (Quantify portions of project that are capacity enhancing by determining the percent of project that will serve new <br />development: The total existing impervious area of basin divided by the future build-out impervious area of basin equals the percent of project serving existing. <br />development. Subtract from 100% to derive the percentage of project that will serve new development.] <br />Transportation Eligible: Non-assessab/e components attributable to future development of 1) arterial and collector street projects and related tra~c signals, and <br />2) off-street bicycle path projects. (Quantify portions of project that are capacity enhancing; pro-rate design/construction management costs on a proportionate <br />basis. In the case of major enhancement projects (e.g. Ferry Street Bridge), use analysis to establish the percent of projected trips on the facility that can be <br />attributed to new development between year of construction and build out]. <br />Parks E/igib/e: Components of Neighborhood or Community park projects attributable to future deve/opment. (Quantify portions of project that are capacity <br />enhancing versus those portions needed to serve existing users. Pro-rate design/construction management costs on a proportionate basis.J <br />Reimbursement Fees: May be spent oniy on capital improvements included in an adopted Capitallmprovement Plan, including those for new <br />facilities and rehabilitation of existing facilities. <br />Wastewater Eligible: Components noted above as well as rehabilitation of existing sysfems (may also serve existing development). <br />Stormwater Eligible: Components noted above as well as rehabilitation of existing systems (may also serve existing development). <br />Tiansportation Eligible: Per Council Resolution No. 4718, reimbursement fees will be budgeted for prese~vation and maintenance of the existing system <br />(Council or the Budget Committee may subsequently a/locate some or a// for a different purpose as allowed by /aw). No transportation reimbursement SDC <br />revenue is currently attributable to off-street bicycle paths; therefore no reimbursement fee expenditures are allowed for paths. <br />Parks Eligible: No parks SDC revenue is currently attributable to a reimbursement fee; therefore no reimbursement fee expenditures are allowed. <br />Allocation Costs & Percentages of?otal Project Costs <br />Project Mitiation Phase Bid Phase Final Phase <br />Wastewater Improve. Fee $ % $ % $ % <br />Approved Amounts, if different: $ % $ % $ % <br />Wastewater Reimburse. Fee $ % $ % $ % <br />Approved Amounts, if different: $ % $ - % $ % <br />Stormwater Improve. Fee $ % $ % $ % <br />Approved Amounts, if different: $ % $ % $ % <br />$tormwater Reimburse. Fee $ % $ % $ % <br />IApproved Amounts, if different: $ % $ % $ % <br />Transportation improve. Fee % $ % $ % <br />Approved Amounts, if different: $ o~o $ o~a $ o~o <br />Transportation Reimburse. Fee 71,020.41 % $ % $ % <br />Approved Amounts, if different: $ %o $ % $ , % <br />Parks Improve. Fee $ % $ % $ % <br />Approved Amounts, if different: $ % $ % $ % <br />Parks Reimburse. Fee $ N/A % $ N/A % $ N/A ° % <br />Approved Amounts, if different: $ o~o $ o~o $ o~o <br />,Expenditure Allocafion Justi~cation <br />Atfach documentation that demonstrates justifcation ofSDC funding of this capital project at projectinitiation phase as well as at time of any <br />su6sequent revisions of SDC aliocation amounts/percentages. <br />$tate law requires an annual accounting of SDGexpenditures by system at the project IeveL'An SDC expenditure may be legally chailenged for up fo <br />two years after the expenditure. <br />Approved By: L-~- ~^^ 1~ ;~1~~Z.~~.L!Q ~-2=~~~ <br /> Date: Date: ~~ lC,~ C~ c Date: <br />a <br />n <br />f:~ F-~U~-~.--~' •~U ~: ~ t`z =" ~(~ y~'i~i l L L~ j~;,~/~:~ ~~~t~°t`iE~ 1 <br />Q:\PROJECTS\PROJ-7\4557 Villard\Design\Budget-EStimates\Villard SDCAIIOCationWrksheet04Mar.xls Revis~arch, 2004 <br />