s <br /> 6. Is the project included in a local, adopted Transportation System or Capital Improvement Plan? Y ~ N ? <br /> Please identify: <br /> TransPlan project #115 <br /> If not, has the need been identified elsewhere? Y ? N ? <br /> Where? <br /> 7. Have local elected officials formally expressed support for this project? * Y ~ N ? <br /> a. Are there currently accesses, driveways, or on street parking within the project limits? Y ~ N ? <br /> b. If so, have local elected officials indicated support for any proposed changes? * Y ~ N ? <br /> c. Are you prepared to hold public hearings, if required? Y ~ N ? <br /> * Please fill inappropriate box on signature page <br /> 8. Does the proposed facility lie within road or street rights-of-way? Y N ? <br /> Projects in parks or abandoned railway tines are not eligible. <br /> Will extra right-of--way need to be purchased? Y ? N <br /> 9. Does an agenc other than the a licant have 'urisdiction over the ri ht-of wa ? Y N <br /> Ifyes, who? <br /> a. Do they concur with your project request? Please fill in appropriate box on signature page Y ? N ? <br /> b. Will they agree to maintain the facility (including landscaping)? Y ? N ? <br /> Please fill in appropriate box on signature page <br /> 10. Is the proposed project to be included in a larger project? Y ~ N ? <br /> (Projects that add sidewalks or bikeways as part of new road construction or reconstruction are not eligible. Projects that tie into other work, <br /> such as repaving, utility or drainage work, are eligible, even encouraged.) <br /> Please describe project, timeline, and other funding sources: <br /> A pavement preservation project on this section of 18u' Avenue was delayed one year to coincide <br /> with the ODOT 2008-2009 grant program. If successful, the paving and construction project <br /> construction will be combined resulting in a savings in engineering and administrative costs. The <br /> projects will be coordinated with the pedestrian gateway improvements being constructed at the <br /> University of Oregon and constructed in advance of the 2008 Olympic Trials at nearby Hayward <br /> Field. <br /> 11. Who will primarily be served by this project? (e.g. school children, commuters, recreational users, seniors, disabled, etc.) <br /> Bicyclists, pedestrians, university students and faculty, people with disabilities, school children. <br /> 12. Does the proposed facility provide alink totransit orpark-and-ride facilities? Y ~ N ? <br /> Ifyes, describe: <br /> LTD bus routes #27 and #78 run on Agate/19th and Hilyard, one block away from each end of <br /> the project area. All of the buses have bike racks. <br /> 13. Does the project include a railroad crossing, or is it within 500' of a RR crossing? Y ? N ~ <br /> Ifyes, do the railroad and the ODOT Rail Crossing Safety Unit concur with your project request? Y ? N ? <br /> (ODOT Rail Crossing Safety Unit phone number: 503-986-4273) Please fill in appropriate box on signature page <br /> 14. Will the project accommodate both pedestrians and bicyclists? Y ~ N ? <br /> If not, is the other mode provided for, or will it be?Describe: <br /> <br /> Bicycle-Pedestrian Program Grant Application FY 2008-09 <br /> <br />