New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Corps G I Study 2002
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Corps G I Study 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2015 11:17:30 AM
Creation date
9/11/2015 11:17:26 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2016
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> 4. Perform a final inspection upon completion of the Section 1135 recreation facilities and prior <br /> to processing final reimbursement payment to the City. <br /> 5. Review any contract change orders administered by the City for any significant changes to <br /> the facilities previously designed by the Corps. <br /> The City of Eugene Will: <br /> 1. Administer the contract for construction of the planned recreation facilities at the Amazon Creek <br /> Wetlands Section 1135 Project. Recreation facilities to be constructed by the city using Section <br /> 1135 funding are summarized below. All facilities will be constructed in accordance with the <br /> detailed plans and specifications previously prepared by the Corps and provided to the City. <br /> Estimated costs for the separable facilities were derived from the Corps' Baseline cost estimate for <br /> the project and include contingencies(September 2000). <br /> a. Greenhill Road Overlook. An overlook adjacent to Greenhill Road with covered <br /> viewing area structures, interpretive displays,parking, sanitary facilities and <br /> landscaping. <br /> Estimated Cost: $245,900 <br /> b. Greenhill Multiple Purpose Path. Approximately 2,200 linear feet of paved multi-use <br /> path along the relocated levee adjacent to Greenhill Road connecting the overlook <br /> site to the Fern Ridge Bike Path. <br /> Estimated Cost: $267,200 <br /> c. Terry Street Multiple Purpose Path. Approximately 1,500 linear feet of paved multi- <br /> use path along the relocated levee connecting providing access across the project area <br /> from Terry Street on the east side of the project to the Fern Ridge Bike Path. <br /> Estimated Cost: $224,800 <br /> d. Royal Avenue Multiple Use Path. Approximately 400 linear feet of paved multiple <br /> use path from an access point along Royal Avenue adjacent to the Amazon Channel <br /> to the Fern Ridge Bike Path. <br /> Estimated Cost: $52,900 <br /> e. Royal Avenue Parking Lot. A small parking lot and access point off of Royal <br /> Avenue with interpretive displays. <br /> Estimated Cost: $69,700 <br /> f. Mobilization and demobilization. Miscellaneous mobilization and demobilization for <br /> the construction of the Section 1135 recreation facilities. <br /> Estimated Cost: $23,400 <br /> Estimated total construction cost $884,000 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.