AMAZON CREEK CHANNEL IMPROVEMENT - PROJECT NO. 15-01 Continued) <br /> 8 . GENERAL RECOMMENDED MAINTENANCE: The maintenance item listed <br /> below currently does not impact the structural integrity of the <br /> project but is recommended to prevent major repairs in the future. <br /> a. Remove encroachments within the project right-of-way which <br /> limit access for maintenance operations and during times of <br /> flooding. Ensure encroachments are coordinated with the City and <br /> the Planning & Engineering Division of the Corps of Engineers, <br /> Portland District. <br /> 9. CONCLUSION AND RATING: Overall, the Amazon Creek Channel <br /> Improvement project is in good condition. The maintenance program <br /> is well executed. The inspection found the general maintenance of <br /> the flood control works to be acceptable. <br /> ohn Todd, P.E. <br /> Civil Engineer <br />