New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Amazon Channel - Storm Sewer
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Amazon Channel - Storm Sewer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2015 11:12:53 AM
Creation date
9/11/2015 11:12:06 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2016
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHECK LIST FOR INSPECTORS <br /> DATE: _ October 26, 1993 <br /> 1. Lower Amazon Flat Creek _ .._.. . <br /> Name of District Total Assessed Valuation Dist. Acreage <br /> Current Tax Rate per . Unit <br /> 2. $ $ <br /> Total Indebtedness Cash on hand in treasury <br /> 3. $ $ . <br /> Pumping operations cost for 12 months. Amount spent for maintenance of levee and <br /> (include operator, electricity, oil & grease) drainage facilities for past 12 months. <br /> 4. Maintenance work accomplished during past 12 months. Give descriptions of work: <br /> Cleaned the channel from W.24th Ave. south 300 feet and reseeded the banks. (Citizen <br /> volunteers removed woody vegetation from W.29th Ave. to W.33rd Ave.) Cleaned bridge <br /> ends at W.29th Ave. , W.30th Ave. , W.31st Ave. and W.33rd Ave. Repaired slide areas on <br /> southubank w/o & e/o Bertelsen Rd. , east bank 'n/o & s/o W.11th Ave. . south bank w/o <br /> 5.c oMaintenance work contemplated in next 12 months' period. Give description of work planned: <br /> Channel cleaning form W.24th Ave. to Madison St. (the lined section of rhe channel) _ <br /> Removal of woody vegetation by citizen volunteers from W.25th Ave. to W.29th Ave. <br /> Removal of blackberry vines on north bank west of Madison St. (at the Fairgrounds) . <br /> Continue bank repair from Terry St. west to the Federal property line west of Fir Butte 'd <br /> 6. Date of last inspection of the flood protective works by 20o filled,_7500 unfilled <br /> the Board: __—_.— Number Sandbags on hand <br />• 7. Location of sand supplies: 1820 Roosevelt Boulevard. Eugene. OR 97402 <br /> 8. Other equipment available for flood emergency: Gradall, 5 backhoes. Cat. dumptrucks. • <br /> 9. District Supervisors: <br /> Name Bob Hammitt Title Maintenance Director. PW Maintenance <br /> Address 1820 Roosevelt Boulevard. Eugene. OR 97402 Phone 687-5221 <br /> Name Gene Shutt TItie_Maintenance Manager, PW Maintenance <br /> Address • Same as above. _ Phone 657-5206 <br /> Name Dave Ritter Title Maintenance Supervisor <br /> Address Same as above. Phone 687-5207 • <br /> Name Title <br /> Address Phone <br /> NPP Form 65 June 85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.