<br /> This comment is an add to the note which I sent last Thursday so no need to read everything. Carolyn and
<br /> Valerie have indicated there is no cross fund (534/535) problem with doing what I suggested in option #1.
<br /> Everyone is relatively comfortable with option #1, so this note is to let everyone know this is the direction we'll
<br /> pursue. By the way, option #1 was'nt something Gene dreamed up but was a minor variation of the option
<br /> suggested by Engineering staff. Dave Ritter is comfortable that we don't have any major contractural channel
<br /> work needing done next year so devoting all funding to a sanitary sewer project next year won't be a problem
<br /> with him. Fred wants us to make sure we focus on correcting I & I problems per our smoke test/dye test program
<br /> but is o.k. with the next fiscal year payback approach, which will mean we'll have about $135,000 contributed ,
<br /> exclusively to sanitary projects next year and that we'll need to work jointly to get a quality project on the drawing
<br /> board early in the fiscal year. Comments and concerns from others have been similar but everyone is
<br /> comfortable that we proceed with option#1.
<br /> Michelle, I added your name to this particular list so if some of the topic matter doesn't make sense, talk with
<br /> Doug Weber or give me a call and we can explain. Since you're still somewhat new to your position and I forgot
<br /> to send you a copy of the original note, but know you will need (or want) the information so am forwarding you a
<br /> copy. Gene
<br /> From: Shutt, Gene
<br /> 4 To: Hammitt, Bob; McVey, Fred; Dixon, Valerie; Kofford, Carolyn; Lyle, Les
<br /> Cc: Gibson, John C.; DeLess, Russ; Ritter, Dave; Zucker, Richard; Weber, Doug
<br /> Subject: Amazon Channel Slide Area
<br /> Date: Thursday, April 07, 1994 4:54PM
<br /> Doug Weber called me and indicates the latest estimate to
<br /> repair the Amazon Channel slide areas to be $263,000. Before
<br /> anyone has heart failure, keep in mind the figure is only an
<br /> estimate but more often than not these estimates are not to
<br /> far off. Anyhow, we have a funding shortfall but there are
<br /> some things we can do. Dave Ritter has $140,000 which Valerie
<br /> will encumber for the project, now we are ONLY 1/8 of a
<br /> million dollars short. Here are a couple of options.
<br /> 1. John Gibson has $172,000 in his operating budget for sewer
<br /> sealing. We hope to do about $40,000/$50,000 of root kill and
<br /> had hoped to do some other sanitary sewer related projects.
<br /> Assuming the 534 and 535 funds and the activity codes for
<br /> these two line items allows us, we could go ahead with the
<br /> root kill project and devote the remainder of the $172,000 to
<br /> the channel rehab project. Carolyn and/or Valerie would have
<br /> to answer the cross fund question. If we are allowed to
<br /> proceed in this manner we could do a payback of sorts next
<br /> budget year. We could devote all FY-95 channel cleaning
<br /> funding ($62,400) to sanitary sewer projects along with the
<br /> $72,400 budgeted for that purpose. I don't believe we have
<br /> identified any major contractural amazon channel projects for
<br /> next year, anyhow. Also, Engineering has plenty of work to
<br /> keep them busy this current year and they could devote quality