New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Amazon Channel - Storm Sewer
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Amazon Channel - Storm Sewer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2015 11:12:53 AM
Creation date
9/11/2015 11:12:06 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2016
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1sTp t. <br /> I �'cn <br /> DEPARTMENT OF THE ARMY <br /> oz./_ x CORPS OF ENGINEERS,PORTLAND DISTRICT <br /> a, M PO BOX 2946 <br /> i II ` <br /> ,�\ e <br /> :• PORTLAND OR 97208-2946 <br /> a%� s''. REPLY TO <br /> srarrt°`P ATTENTION OF OCT 1 5 2003 <br /> Operations Division <br /> Mr. Johnny Medlin, POS Division Manager <br /> Department of Public Works, City of Eugene <br /> 1820 Roosevelt Blvd. <br /> Eugene, Oregon 97402 <br /> Dear Mr. Medlin: <br /> Enclosed is the report of the annual inspection of the flood control facilities along <br /> Amazon Creek, conducted on September 10, 2003. During the inspection,the city was <br /> represented by John Clark,Natural Resource Maintenance Supervisor; Richard Zucker, <br /> Maintenance Crew Supervisor; Trevor Taylor,Natural Resources, Operations Coordinator; and <br /> Brian Elliott, Environmental Project Coordinator. The inspection was conducted to evaluate the <br /> structural integrity, to assess your flood emergency preparedness, and to provide any advice <br /> needed regarding operation and maintenance. The required maintenance item listed in the report, <br /> under paragraph 7, needs to be completed prior to the next inspection. An"Excellent" rating is <br /> assigned and the structure remains in an active status in our inspection program. <br /> Our assessment of your overall flood emergency preparedness considers your plan, training <br /> needs, stockpiled supplies, availability of equipment, and access for emergency operations. An <br /> updated list of contacts for the U.S. Army Corps of Engineers, Portland District is enclosed. <br /> If we can assist you further with the operation and maintenance of your flood protection <br /> facility, or with your emergency preparedness program, please contact Les Miller, Chief, <br /> Emergency Management Branch at(503) 808-4400. <br /> Sincerely, <br /> •/ !'icier <br /> C. e S `� 1 A eborah L. Chenoweth <br /> Chief, Operations Division <br /> ,,(3 <br /> ---4-e-CC LAA4r.- I <br /> Ste. 1\ i !Awl <br /> cad t iucKS <br /> a •,e c( 2ucec- <br /> 0 C- Printed on 41°) Recycled Paper <br /> c".(Ct—V'.. I I c O <br />
The URL can be used to link to this page
Your browser does not support the video tag.