AMAZON CREEK CHANNEL IMPROVEMENT - PROJECT NO. 15-01 (Continued) <br /> d. Encroachments on the right-of-way were noted at the <br /> following locations : scrap steel is stored along sections of the <br /> shoulder (right bank) upstream of Oak Patch Road; and a fence is <br /> located along the shoulder (right bank) at the county <br /> fairgrounds . These encroachments do not impact the integrity of <br /> the project and they will not limit access for construction <br /> equipment in these areas during maintenance operations and during <br /> times of flooding. Repairs and flood fight operations would be <br /> conducted from the opposite bank. <br /> 6 . RESOLUTION OF PERMITS : None . <br /> 7 . REQUIRED MAINTENANCE TO ENSURE PROJECT INTEGRITY: The <br /> following maintenance item should be corrected prior to the next <br /> inspection: <br /> LOCATION REQUIRED MAINTENANCE ESTIMATED QUANTITIES <br /> Various Selective clearing 0 . 5 acre <br /> of trees and brush <br /> in channel <br /> 8 . GENERAL RECOMMENDED MAINTENANCE. None . <br /> 9 . CONCLUSION AND RATING: The Amazon Creek Channel Improvement <br /> project is well maintained. The inspection found the general <br /> maintenance of the flood control works to be "Excellent" . <br /> John Todd, P.E. <br /> Civil Engineer <br />