New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Walnut Grove
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Walnut Grove
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2015 1:34:11 PM
Creation date
8/24/2015 1:33:59 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2016
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JAN-21-1997 11 54 SALIX ASSOCIATES 503 341 1752 P.01 <br /> Salix Associates 2525 Potter.Eugene,OR 97405.541-343.2364-fax 541-341-1752 <br /> 17 January 1997 <br /> Dear Reviewers: <br /> Salix Associates has been contracted to prepare a habitat management plan for the "Walnut Grove" site <br /> (which I am proposing be re-named "Spring Creek Natural Area" to reflect it's natural values). At some <br /> time in the past, most of you have been involved in planning issues on the site (it contains a breeding <br /> population of western pond turtles), so I have not included a map. The site is in northwest Eugene, on the <br /> east side of the Northwest Expressway,just south of the Maxwell Connector. The habitat management <br /> plan will be used as a guide by the Maintenance Division, which has agreed to manage the site. <br /> We intend to develop this plan with as much input as possible from all of you, and if you have suggestions <br /> from others who could provide pertinent information, please let me know. If you do not wish to provide <br /> input into the plan, please let me know that as well, and I will not send further faxes. <br /> I ask, at a minimum, that you review the attached draft Table of Contents, and provide input to me by <br /> January 24th(Friday noon). I will be seeking review of the draft plan when it is completed around <br /> February 13. <br /> Thank <br /> 3- <br /> Thank you for your assistance and comments. <br /> Cordially,' ` <br /> Dig_ <br /> Bruce Newhouse, AICP <br /> cc: Surma Murray, Development Division <br /> Johnny Medlin, Maintenance Division <br /> Deborah Evans, Engineering Division <br /> Bill Castillo, ODFW <br /> Esther Lev, Wildlife Biologist <br /> Kat Beal, US Army Corps of Engineers <br /> Ed Alverson, TNC <br /> Dan Gleason, Lane County Audubon Society <br /> Ethen Perkins, Botanist <br /> Inventory,research,and planning for wetlands,forest lands,and other natural resources- <br />
The URL can be used to link to this page
Your browser does not support the video tag.