New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Vegetation (2)
COE
>
PW
>
POS_PWM
>
Parks
>
Miscellaneous
>
Vegetation (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2014 10:51:32 AM
Creation date
10/17/2014 10:47:42 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Identification_Number
Medlin Veg Folder
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ACTIVITY COSTS PER INSPECTED & NONABATED PROPERTY <br />In the previous 2 sections we have calculated total 1989 program operations <br />costs, 1989 program administration costs, and typical activity costs involved <br />in a typical full term abatement incurred by the City's Vegetation Management <br />Program in each of the program's management categories (Tables IV thru VIII). <br />If we multiply the activity costs for each full term abatement in both the <br />developed and undeveloped property categories (calculated from Tables VI & <br />VII) by the number of such abatements, we get the total activity costs <br />incurred by the Vegetation Management Program in the actual physical abatement <br />of vegetation nuisances. When these full term abatement costs are subtracted <br />from each category's 1989 operations costs, the resultant figures show the <br />program costs incurred in processing those complaints and inspecting those <br />properties that did not result in a City performed abatement. <br />DEVELOPED PROPERTY <br />During calendar year 1989 the City performed 22 developed property abatements <br />at a typical cost of $74.38 per abatement. This equates to $1,636.36 of the <br />annual activity costs of the developed property management category. When <br />this figure is subtracted from the total operations costs of $13,931 (from <br />Table IV) we show $12,294.64 in program operations activity costs incurred in <br />processing nuisance complaints that did not require abatement by the City. If <br />we divide this amount by the total of 564 such complaints (from Table II) we <br />show that, on the average, $21.80 was incurred by the City's Vegetation <br />Management Program in the resolution of each developed property vegetation <br />complaint received. <br />UNDEVELOPED PROPERTY <br />During calendar year 1989 the City performed 139 abatements on undeveloped <br />property at a typical cost of $67.85 per abatement. Multiplied out, this <br />equates to $9,431.15 of the annual operations activity costs of the un- <br />developed property management category. When this figure is subtracted from <br />the total operations activity cost of $15,648 (from Table IV) we are left with <br />$6,216.85 in operations activity costs incurred in processing nuisance <br />complaints that did not require abatement by the City or conducting the <br />systematic inspection of all undeveloped properties within the City. If we <br />divide this amount by the total of 5784 privately owned undeveloped properties <br />that did not require abatement by the City we show that, on the average, <br />$1.07 was incurred by the City's Vegetation Management Program per undeveloped <br />property in the systematic inspection of undeveloped property that did not <br />require City abatement. <br />5 Lane Council of Governments data, as of 1/1/89, show 5923 non City <br />owned undeveloped properties within the City limits. Of these, 139 required <br />City performed abatements leaving 5,784 that did not require City abatement. <br />Vegetation Program <br />Cost Analysis 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.