New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Vegetation (2)
COE
>
PW
>
POS_PWM
>
Parks
>
Miscellaneous
>
Vegetation (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2014 10:51:32 AM
Creation date
10/17/2014 10:47:42 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Identification_Number
Medlin Veg Folder
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE VI <br />COST PER TYPICAL CITY OWNED PROPERTY ABATEMENT <br />Minutes Rate Cost <br />FIELD TIME <br />Initial investigation 25 <br />Post abatement inspection 15 <br />Total 40 = .67 hrs x $17.29 / hr = $11.58 <br />OFFICE TIME <br />Draft work order 35 <br />Process billing invoice 10 <br />Total 45 = .75 hrs x $17.29 / hr = $12.97 <br />VEHICLE USAGE TIME <br />Sedan with radio 40 = .67 hrs x $5.00 / hr = $ 3.35 <br />MATERIALS & SERVICES <br />Stationary, printing, & copying $ .52 <br />City Property Activity Cost Per Abatement = $28.42 <br />When we multiply the activity cost for a typical City owned property abatement <br />by the previously mentioned Maintenance Division overhead rate of 32.8 %, we <br />get a calculated overhead cost of $9.32. Added to the calculated typical <br />activity cost for such an abatement of $28.42, we get a total of $37.74 <br />incurred by the City in the abatement of City owned property vegetation <br />nuisances. However, in order to utilize the contractor's time efficiently, <br />many of these work orders included as many as 15 individual taxlots being cut <br />simultaneously. The 85 abatements (work orders) of City property during the <br />1989 field season actually involved 614 parcels of City land. This equates to <br />7.2 parcels of City property dealt with per abatement and a resultant cost of <br />only $5.24 per parcel. <br />II. OPERATIONS COSTS PER MANAGEMENT CATEGORY <br />The table on the following page (Table VII) illustrates the breakdown of the <br />Vegetation Management Program's 1989 operational expenditures between the 3 <br />management categories. The percent of each line item as well as the resultant <br />dollar figures are itemized under each categorical heading. As previously <br />mentioned, expenditures inherent to all 3 management categories will either be <br />divided equally between categories, allocated by the percentage of the <br />program's operation time per category, or allocated according to percentages <br />based on calculated or documented costs per category. <br />Vegetation Program <br />Cost Analysis 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.