New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
4J Stadium, Through May 1999
COE
>
PW
>
POS_PWM
>
Parks
>
Miscellaneous
>
4J Stadium, Through May 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2014 1:47:14 PM
Creation date
10/16/2014 11:23:51 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Churchill Cost Revisions <br /> I Reductions <br /> Remove the redundant soft costs from the sand channel drainage system ;$ 51,936 <br /> Reduce the number of picnic tables from 8 to 4 in neighborhood park area $ 3,452 <br /> Separate out lighting as add alternate $ ` 10,959 <br /> Eliminate section of path at west node area $ 4,409 <br /> Replace rubber playground surface with engineered wood chip $ 62,765 <br /> Reduce drainage at playground $ 10,582 <br /> Separate out re- surfacing of tennis courts as add alternate $ 22,428 <br /> Reduce re- construction of ball walls at tennis courts from four to two $ 10,407 <br /> Reduce length of run for water service to picnic shelter $ 1,008 <br /> Reduce length of run for water service to restrooms $ 756 <br /> Eliminate fire service at restroom $ 21,286 <br /> Eliminate west side path entirely $ 15,982 <br /> Change section of east side path from concrete to asphalt $ 6,553 <br /> Remove picnic tables from site furnishings budget $ 3,452 <br /> Resultant reduction in mobilization estimate $ .7,045 <br /> Total cost reductions for Churchill $ 233,000 <br /> (Additions 1 <br /> Modify scope of skatepark to match original budget allocation of 125,000 $ 20,938 <br /> Add handrail to west node development for accessible trail $ 8,818 <br /> Add irrigation to park entry node $ 10,077 <br /> Add improvement to damaged electrical panel at tennis courts $ 6,298 <br /> Increased length of storm system for restrooms $ 1,008 <br /> Increased length of storm system for site $ 4,409 <br /> Increased length of domestic water for site $ 3,275 <br /> Resultant increase in mobilization estimate $ 756 <br /> Total cost increases for Churchill $ 55,579 <br /> Net cost reduction for Churchill to date $ 177,421 <br /> Recommendations for Churchill <br /> I Reductions 1 <br /> No further reductions in scope or material allowances for park features are advised, <br /> with the following exception: <br /> Covered bike parking as add alternate $ 5,500 <br /> Some areas of potential savings that may arise from further investigation of site conditions: <br /> Reduce or eliminate imported topsoil for softball areas $ 30,000 <br /> Reduce or eliminate imported topsoil for park areas $ 25,000 <br /> Reduce or eliminate imported topsoil for entry nodes $ 10,000 <br /> Reduce west node development cost through design efficiencies $ 10,000 <br /> Reduce utility costs through design efficiencies ? <br /> (Budget items to restore /add <br /> Restore original playground budget to 60,000, add difference to equipment $ 21,105 <br /> Restore (2) picnic tables to misc. site furnishings $ 1,725 <br /> Increase minimum width of park paths from 5' to 6' $ 5,600 <br /> Change galvanized chain link fence to black, plastic coated chain link fence ? <br />
The URL can be used to link to this page
Your browser does not support the video tag.