GILHAM SCHOOL FIELD IMPROVEMENTS <br /> Preliminary Cost Estimate <br /> item min max <br /> Each field combo (softball /soccer) $125,000 $150,000 <br /> Includes: design fees <br /> cleaning surface <br /> importing loam <br /> grading <br /> turf <br /> automatic irrigation <br /> backstop, benches etc. <br /> Drainage, if needed (standard - not fancy) $40,000 <br /> Includes: 4" slotted drain pipe 15' o/c <br /> sand cover <br /> Total, one field combo: $125,000 $190,000 <br /> Total, two field combos: tVg i ,OOij <br /> Notes: <br /> 1. One softball field exists at the site, with a backstop and benches (serviceable but of low <br /> quality). The existing field is also of low quality. <br /> 2. Existing irrigation water meter is confirmed. <br /> 3. Based upon field observations, the quality of the existing soil (un -sorted river rock and day) <br /> would suggest that drainage is a consideration. However, actual wet - season drainage <br /> conditions need to be verified. <br />