EUGENE SCHOOL DISTRICT 4J - MULTI -USE ATHLETIC FIELDS STUDY FEBRUARY 4, 1999 <br /> PROJECT COST SUMMARY <br /> OPTION 1 - FOUR SEPARATE FIELDS <br /> CHURCHILL HIGH SCHOOL @ EXISTING TRACK SITE <br /> A B C D E F <br /> BASIC BASIC FIELD ADD ADD ADD ALL <br /> FIELD & UTILITY BLEACHERS ADDITIONAL RESTROOMS & FEATURES <br /> COSTS SERVICES & LIGHTS COMPONENTS CONCESSIONS INCLUDED <br /> BASIC FIELD COMPONENTS <br /> 1 FIELD ENGINEERING 39,200 59,200 59,200 59,200 $9,200 59,200 <br /> 2 FIELD SURFACE AND DRAINAGE 5951,440 5951,440 5951,440 5951,440 3951,440 3951,440 <br /> 3 CHAIN LINK FENCE AND GATES 536,839 536,839 536,839 536,839 536,839 536,839 <br /> 4 PAVEMENT BETWEEN FENCE AND FIELD 3106,437 5106,437 5106,437 5106,437 3106,437 5106,437 <br /> 5 WALKWAY BETWEEN PARKING AND FIELD 337,567 537,567 537,567 537,567 337,567 337,567 <br /> 6 EMERGENCY AND SERVICE VEHICLE ACCESS 50 30 SO 50 30 50 <br /> 7 TRACK AND FIELD AMENITIES REPLACEMENT 530,896 530,896 530,896 530,896 330,896 530,896 <br /> 8 GOAL POSTS 55,638 55,638 55,638 55,638 55,638 55,638 <br /> I SUB -TOTAL BASIC FIELD COMPONENTS $1,178,017 <br /> BASIC UTILITY SERVICES ROUGH -IN <br /> 9 ADD FIRE WATER UTILITY SERVICE 554,818 554,818 554,818 554,818 554,818 <br /> 10 ADD ELECTRICAL UTILITY SERVICE $43,978 543,978 $43,978 $43,978 $43,978 <br /> SUB -TOTAL BASIC FIELD COMPONENTS & UTIUTY ROUGH-IN $1,276,813 <br /> ADDITIONAL PROJECT ENHANCEMENTS <br /> ADD BLEACHERS AND FIELD LIGHTING <br /> 11 ADD 1000 SEAT GRANDSTAND 5194,703 5194,703 3194,703 3194,703 <br /> 12 ADD ELEVATOR TO OBSERVATION BOOTH 30 30 S0 50 <br /> 13 ADD FIELD LIGHTING 5132,460 3132,460 3132,460 3132,460 <br /> I SUB -TOTAL BASIC FIELD COMP. & UTILITY ROUGH -IN & BLEACHERS & LIGHTING_ $1,603,976 <br /> ADD OTHER PROPOSED PROJECT AMENITIES <br /> 14 ADD SCORE BOARD 523,312 323,312 323,312 <br /> 15 ADD ACOUSTICAL SOUND SYSTEM 11 8, 3 2 3 13,8,3792 12 32 13,8,3 2 <br /> 1 7 94 <br /> 16 ADD DUMPSTER STORAGE AREA <br /> I ADD ADDITIONAL COMPONENTS 31,652,254 <br /> ADD REST ROOM FACIUTIES 5278154 5278,154 <br /> 17 ADD RESTROOM FACILITIES 278,859 278,859 <br /> 18 ADD CONCESSION BUILDING 372,899 572,899 <br /> 19 ADD SANITARY SEWER UTILITY SERVICE 547070 549,070 <br /> 20 ADD DOMESTIC WATER UTILITY SERVICE <br /> I SUB -TOTAL FIELDS & UTILITY ROUGH-1N & BLEACHERS & UGHTING & RESTROOMS _ $2,099,410 <br /> REMAINING PROJECT COMPONENTS 5106,936 <br /> 21 ADD WALKWAY LIGHTING BETWEEN PARKING AND FIELD <br /> I TOTAL PROJECT COSTS FOR ALL PROJECT COMPONENTS 32,206,346 <br /> y4/99 <br /> WBGS ARCHITECTURE PLANNING PC PAGE 2 <br /> PROJECT COST SUMMARY <br />