EUGENE SCHOOL DISTRICT 4J - MULTI -USE ATHLETIC FIELDS STUDY FEBRUARY 4, 1999
<br /> PROJECT COST SUMMARY
<br /> OPTION 1 - FOUR SEPARATE FIELDS
<br /> CHURCHILL HIGH SCHOOL @ EXISTING TRACK SITE
<br /> A B C D E F
<br /> BASIC BASIC FIELD ADD ADD ADD ALL
<br /> FIELD & UTILITY BLEACHERS ADDITIONAL RESTROOMS & FEATURES
<br /> COSTS SERVICES & LIGHTS COMPONENTS CONCESSIONS INCLUDED
<br /> BASIC FIELD COMPONENTS
<br /> 1 FIELD ENGINEERING 39,200 59,200 59,200 59,200 $9,200 59,200
<br /> 2 FIELD SURFACE AND DRAINAGE 5951,440 5951,440 5951,440 5951,440 3951,440 3951,440
<br /> 3 CHAIN LINK FENCE AND GATES 536,839 536,839 536,839 536,839 536,839 536,839
<br /> 4 PAVEMENT BETWEEN FENCE AND FIELD 3106,437 5106,437 5106,437 5106,437 3106,437 5106,437
<br /> 5 WALKWAY BETWEEN PARKING AND FIELD 337,567 537,567 537,567 537,567 337,567 337,567
<br /> 6 EMERGENCY AND SERVICE VEHICLE ACCESS 50 30 SO 50 30 50
<br /> 7 TRACK AND FIELD AMENITIES REPLACEMENT 530,896 530,896 530,896 530,896 330,896 530,896
<br /> 8 GOAL POSTS 55,638 55,638 55,638 55,638 55,638 55,638
<br /> I SUB -TOTAL BASIC FIELD COMPONENTS $1,178,017
<br /> BASIC UTILITY SERVICES ROUGH -IN
<br /> 9 ADD FIRE WATER UTILITY SERVICE 554,818 554,818 554,818 554,818 554,818
<br /> 10 ADD ELECTRICAL UTILITY SERVICE $43,978 543,978 $43,978 $43,978 $43,978
<br /> SUB -TOTAL BASIC FIELD COMPONENTS & UTIUTY ROUGH-IN $1,276,813
<br /> ADDITIONAL PROJECT ENHANCEMENTS
<br /> ADD BLEACHERS AND FIELD LIGHTING
<br /> 11 ADD 1000 SEAT GRANDSTAND 5194,703 5194,703 3194,703 3194,703
<br /> 12 ADD ELEVATOR TO OBSERVATION BOOTH 30 30 S0 50
<br /> 13 ADD FIELD LIGHTING 5132,460 3132,460 3132,460 3132,460
<br /> I SUB -TOTAL BASIC FIELD COMP. & UTILITY ROUGH -IN & BLEACHERS & LIGHTING_ $1,603,976
<br /> ADD OTHER PROPOSED PROJECT AMENITIES
<br /> 14 ADD SCORE BOARD 523,312 323,312 323,312
<br /> 15 ADD ACOUSTICAL SOUND SYSTEM 11 8, 3 2 3 13,8,3792 12 32 13,8,3 2
<br /> 1 7 94
<br /> 16 ADD DUMPSTER STORAGE AREA
<br /> I ADD ADDITIONAL COMPONENTS 31,652,254
<br /> ADD REST ROOM FACIUTIES 5278154 5278,154
<br /> 17 ADD RESTROOM FACILITIES 278,859 278,859
<br /> 18 ADD CONCESSION BUILDING 372,899 572,899
<br /> 19 ADD SANITARY SEWER UTILITY SERVICE 547070 549,070
<br /> 20 ADD DOMESTIC WATER UTILITY SERVICE
<br /> I SUB -TOTAL FIELDS & UTILITY ROUGH-1N & BLEACHERS & UGHTING & RESTROOMS _ $2,099,410
<br /> REMAINING PROJECT COMPONENTS 5106,936
<br /> 21 ADD WALKWAY LIGHTING BETWEEN PARKING AND FIELD
<br /> I TOTAL PROJECT COSTS FOR ALL PROJECT COMPONENTS 32,206,346
<br /> y4/99
<br /> WBGS ARCHITECTURE PLANNING PC PAGE 2
<br /> PROJECT COST SUMMARY
<br />
|