EUGENE SCHOOL DISTRICT 4J - MULTIUSE ATHLETIC FIELDS STUDY FEBRUARY 4, 1999
<br /> PROJECT COST SUMMARY
<br /> OPTION 1 - FOUR SEPARATE FIELDS
<br /> SHELDON HIGH SCHOOL -ON EXISTING FIELDS EAST OF TRACK
<br /> A B C D E F
<br /> BASIC BASIC FIELD ADD ADD ADD ALL
<br /> FIELD & UTILITY BLEACHERS ADDITIONAL RESTROOMS & FEATURES
<br /> COSTS SERVICES & LIGHTS COMPONENTS CONCESSIONS INCLUDED
<br /> BASIC FIELD COMPONENTS
<br /> 1 FIELD ENGINEERING $8,486 58,486 $8,486 $8,486 38,486 58,486
<br /> 2 FIELD SURFACE AND DRAINAGE 5955,019 5955,019 3955,019 3955,019 $955,019 3955,019
<br /> 3 CHAIN LINK FENCE AND GATES $26,740 326,740 $26,740 $26,740 526,740 326,740
<br /> 4 PAVEMENT BETWEEN FENCE AND FIELD 3133,221 3133,221 5133,221 $133,221 5133,221 3133,221
<br /> 5 WALKWAY BETWEEN PARKING AND FIELD 522,540 522,540 $22,540 $22,540 522,540 522,540
<br /> 6 EMERGENCY AND SERVICE VEHICLE ACCESS 30 30 30 $0 $0 30
<br /> 7 TRACK AND FIELD AMENITIES REPLACEMENT 316,499 516,499 516,499 316,499 516,499 516,499
<br /> 8 GOAL POSTS 35,638 $5,638 $5,638 35,638 $5,638 $5,638
<br /> I SUB -TOTAL BASIC FIELD COMPONENTS 51,168,143
<br /> BASIC UTILITY SERVICES ROUGH -IN
<br /> 9 ADD FIRE WATER UTILITY SERVICE 313,116 313,116 313,116 313,116 513,116
<br /> 10 ADD ELECTRICAL UTILITY SERVICE 345,830 345,830 545,830 345,830 345,830
<br /> I SUB -TOTAL BASIC FIELD COMPONENTS & UTILITY ROUGH -IN 51,227,089
<br /> ADDITIONAL PROJECT ENHANCEMENTS
<br /> ADD BLEACHERS AND FIELD UGHTING
<br /> 11 ADD 1000 SEAT GRANDSTAND 5194,703 3194,703 5194,703 3194,703
<br /> 12 ADO ELEVATOR TO OBSERVATION BOOTH $0 $0 $O 30
<br /> 13 ADD FIELD LIGHTING 3127,535 $127,535 $127,535 3127,535
<br /> I SUB -TOTAL BASIC FIELD COMP. & UTILITY ROUGH -IN & BLEACHERS & UGHTING 51,549,327
<br /> ADD OTHER PROPOSED PROJECT AMENITIES
<br /> 14 ADD SCORE BOARD 323,312 1 3,312 $ 3 223,312 323,312
<br /> 15 ADD ACOUSTICAL SOUND SYSTEM $8 192 318,794 2 32 13,8,3 2
<br /> 17 94
<br /> 16 ADD DUMPSTER STORAGE AREA
<br /> I ADD ADDITIONAL COMPONENTS 31,597,605
<br /> ADO REST ROOM FACILFTIES 54 3278,154
<br /> 278,
<br /> 17 ADO RESTROOM FACILITIES $278,59 372,899
<br /> 37 2
<br /> 18 ADD CONCESSION BUILDING 331,710 37
<br /> 19 ADD SANITARY SEWER UTILITY SERVICE 3 1,8 9 ,7 10 3
<br /> 20 ADD DOMESTIC WATER UTILITY SERVICE
<br /> I SUB -TOTAL FIELDS & UTILITY ROUGH -IN & BLEACHERS & LIGHTING & RESTROOMS _ 51,987,466
<br /> REMAINING PROJECT COMPONENTS $114,497
<br /> 21 ADD WALKWAY LIGHTING BETWEEN PARKING AND FIELD
<br /> I TOTAL PROJECT COSTS FOR ALL PROJECT COMPONENTS 52,101,963
<br /> 214!99
<br /> WBGS ARCHITECTURE PLANNING PC PAGE 4