EUGENE SCHOOL DISTRICT 4J - MULTIUSE ATHLETIC FIELDS STUDY FEBRUARY 4, 1999 <br /> PROJECT COST SUMMARY <br /> OPTION 1 - FOUR SEPARATE FIELDS <br /> SHELDON HIGH SCHOOL -ON EXISTING FIELDS EAST OF TRACK <br /> A B C D E F <br /> BASIC BASIC FIELD ADD ADD ADD ALL <br /> FIELD & UTILITY BLEACHERS ADDITIONAL RESTROOMS & FEATURES <br /> COSTS SERVICES & LIGHTS COMPONENTS CONCESSIONS INCLUDED <br /> BASIC FIELD COMPONENTS <br /> 1 FIELD ENGINEERING $8,486 58,486 $8,486 $8,486 38,486 58,486 <br /> 2 FIELD SURFACE AND DRAINAGE 5955,019 5955,019 3955,019 3955,019 $955,019 3955,019 <br /> 3 CHAIN LINK FENCE AND GATES $26,740 326,740 $26,740 $26,740 526,740 326,740 <br /> 4 PAVEMENT BETWEEN FENCE AND FIELD 3133,221 3133,221 5133,221 $133,221 5133,221 3133,221 <br /> 5 WALKWAY BETWEEN PARKING AND FIELD 522,540 522,540 $22,540 $22,540 522,540 522,540 <br /> 6 EMERGENCY AND SERVICE VEHICLE ACCESS 30 30 30 $0 $0 30 <br /> 7 TRACK AND FIELD AMENITIES REPLACEMENT 316,499 516,499 516,499 316,499 516,499 516,499 <br /> 8 GOAL POSTS 35,638 $5,638 $5,638 35,638 $5,638 $5,638 <br /> I SUB -TOTAL BASIC FIELD COMPONENTS 51,168,143 <br /> BASIC UTILITY SERVICES ROUGH -IN <br /> 9 ADD FIRE WATER UTILITY SERVICE 313,116 313,116 313,116 313,116 513,116 <br /> 10 ADD ELECTRICAL UTILITY SERVICE 345,830 345,830 545,830 345,830 345,830 <br /> I SUB -TOTAL BASIC FIELD COMPONENTS & UTILITY ROUGH -IN 51,227,089 <br /> ADDITIONAL PROJECT ENHANCEMENTS <br /> ADD BLEACHERS AND FIELD UGHTING <br /> 11 ADD 1000 SEAT GRANDSTAND 5194,703 3194,703 5194,703 3194,703 <br /> 12 ADO ELEVATOR TO OBSERVATION BOOTH $0 $0 $O 30 <br /> 13 ADD FIELD LIGHTING 3127,535 $127,535 $127,535 3127,535 <br /> I SUB -TOTAL BASIC FIELD COMP. & UTILITY ROUGH -IN & BLEACHERS & UGHTING 51,549,327 <br /> ADD OTHER PROPOSED PROJECT AMENITIES <br /> 14 ADD SCORE BOARD 323,312 1 3,312 $ 3 223,312 323,312 <br /> 15 ADD ACOUSTICAL SOUND SYSTEM $8 192 318,794 2 32 13,8,3 2 <br /> 17 94 <br /> 16 ADD DUMPSTER STORAGE AREA <br /> I ADD ADDITIONAL COMPONENTS 31,597,605 <br /> ADO REST ROOM FACILFTIES 54 3278,154 <br /> 278, <br /> 17 ADO RESTROOM FACILITIES $278,59 372,899 <br /> 37 2 <br /> 18 ADD CONCESSION BUILDING 331,710 37 <br /> 19 ADD SANITARY SEWER UTILITY SERVICE 3 1,8 9 ,7 10 3 <br /> 20 ADD DOMESTIC WATER UTILITY SERVICE <br /> I SUB -TOTAL FIELDS & UTILITY ROUGH -IN & BLEACHERS & LIGHTING & RESTROOMS _ 51,987,466 <br /> REMAINING PROJECT COMPONENTS $114,497 <br /> 21 ADD WALKWAY LIGHTING BETWEEN PARKING AND FIELD <br /> I TOTAL PROJECT COSTS FOR ALL PROJECT COMPONENTS 52,101,963 <br /> 214!99 <br /> WBGS ARCHITECTURE PLANNING PC PAGE 4 <br /> PROJECT COST SUMMARY <br />