• <br /> EUGENE SCHOOL DISTRICT 4J <br /> Multi- Purpose Athletic Field Concept Study - Predevelopment Meeting age 5 <br /> January 8, 1999 <br /> Drinking fountains are code required <br /> 1000 seats = 2 drinking fountains (one high & one low) <br /> 2000 seats = 2 drinking fountains (one high & one low) <br /> Site Utilities - Special questions <br /> Storm Water <br /> ❑ For the proposed development at North Eugene High School <br /> please clarify the existence, location, and size of the existing <br /> storm drain system in Escalante, north of Silver Lane, and <br /> provide clarification if there is capacity in this system to add a <br /> connection from the new fields. <br /> Any collected storm water will be diverted to existing storm drainage <br /> systems at the Kennedy /Churchill and South Eugene sites. <br /> Any collected storm water will be diverted to new dry wells at the Sheldon <br /> and North sites. <br /> ❑ Is this an acceptable method of treating storm water at each site? <br /> Systems Development Charges <br /> ❑ Systems Development Charges and how they apply to this project <br /> needs to be clarified. <br /> Transportation - Proposed activities at the new fields for the football <br /> teams will replace existing use at Autzen Stadium on Friday evenings <br /> during football season, not create a new use or increased demand on <br /> existing transportation services. <br /> No additional parking capacity is planned at any of the sites. <br /> In all cases field seating capacities are less than current gymnasium <br /> seating and the schools would avoid simultaneous scheduling of events at <br /> both facilities. <br /> o We propose that the Transportation SDC charge be $0.00 for <br /> these projects. Is this acceptable? <br />