Work Order Request Form <br /> Public Works Facility Management Division <br /> Operations/Maintenance Section <br /> Instructions: Requestors complete Sections 1, 2, and 3. Enter applicable information on RED lines. <br /> Section 1 <br /> Type of Work Request: X Maintenance (Work needed to maintain existing systems) <br /> Enhancement (Supply Fund/DVSW /Object/Activity below) <br /> Section 2 <br /> Priority : (Check one) Requestor to supply <br /> account code ONLY if <br /> 1 Emergency enhancement project <br /> (Life,Health,Safety Fund Building #: unk <br /> issue requiring DVSW Room #: unk <br /> immediate response) Object Address: near 24th & Amazon Drive <br /> 2 X All other requests Activity Description: Ball Field Restroom Building <br /> (Facilities will Men's Side <br /> prioritize) <br /> Date Entered: 03 -13 -97 Phone # 4827 Requested By: Larry Greenwood <br /> Date Required: 03 -20 -97 <br /> Date Received: Phone # 4826 Authorized By: Tim Rhay <br /> Section 3 <br /> Work Required: Replace sink broken by vandals <br /> See NOTE under "Other Instructions" <br /> Check One: <br /> Electrical Carpentry Other NOTE: The Director of Public Works Maintenanc <br /> HVAC Painting Instructions: strongly requests replacement with a stainless <br /> Plumbing X Lock/Key steel sink to prevent future breakage and end the <br /> Other serial destruction of fixtures at this facility. <br /> Section 4 <br /> Labor # Hrs. @Rate Total Labor Materials Materials Used Total Materials <br /> Estimate: $0.00 Estimate: <br /> $0.00 <br /> $0.00 <br /> $0.00 <br /> $0.00 $0.00 <br /> Estimated Total Cost: $0.00 <br /> PWF Office Use Only Comments/Notes: <br /> WO # <br /> GJN <br /> Priority <br /> 20- Mar -97 <br />