New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Alton Baker Park
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Alton Baker Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2014 4:32:46 PM
Creation date
8/20/2014 4:32:23 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agency /State <br /> Agreement No. 26219 <br /> maintenance fund requirements and Not to Exceed (NTE) State funding <br /> obligations outlined in this Agreement. <br /> b. Specific areas of responsibility including, but not limited to: <br /> 1) Agency area of responsibility and obligations for design enhancements: <br /> • Design enhancements maintained by Agency or a designee that is <br /> mutually agreed upon by both Parties <br /> • Legal title <br /> • Provide comments on: <br /> o Design and Construction <br /> o Long term care expectations <br /> o Maintenance and repair expectations and schedule <br /> o Life expectancy <br /> o Replacement and /or disposal expectations <br /> • Provide long term care, maintenance and repair, and replacement <br /> and /or disposal of accepted design enhancements <br /> • If Agency is unable to maintain a particular design enhancement or <br /> commences maintenance and then determines it is unable to continue, <br /> Agency may solicit public support to provide needed maintenance or <br /> repairs. If public support cannot be garnered to provide maintenance <br /> and /or repairs of a particular design enhancement Agency may <br /> remove the design enhancement from the State right of way upon <br /> notice of intended removal and State acceptance of removal schedule. <br /> Agency may choose to accept the management and maintenance of one <br /> of more of the design enhancements but is under no obligation to do so. <br /> If Agency chooses not to accept the management and maintenance of <br /> one or more of the design enhancements, it will not be placed on the <br /> State right of way unless State agrees to accept all responsibility for such <br /> maintenance or management. <br /> 2) State area responsibility and obligations for design enhancements: <br /> • Provide comments on: <br /> o Design and Construction <br /> o Long term care expectations <br /> o Maintenance and repair expectations and schedule <br /> o Life expectancy <br /> Key 14259 Page 10 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.