New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Parks, U of O, TDM
COE
>
PW
>
POS_PWM
>
Parks
>
General Parks Info
>
Parks, U of O, TDM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2014 3:39:55 PM
Creation date
8/20/2014 3:39:05 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
13. Short -cuts from Lot 8. New trails have been created along the north edge of Lot 8. There is <br />a steep embankment along this edge which individuals climb up to short cut from the parking <br />lot to the stadium. <br />Recommendation: Create pedestrian access points from Lot 8 up to the sidewalk along Leo <br />Harris Parkway. These access points should be consistent with the future envisioned uses of Lot <br />8 as defined in the East Alton Baker Park Plan. The design of access points will be performed by <br />City Staff when deemed appropriate. This is a low priority impact. <br />ADDITIONAL IMPACTS <br />14. Park access. The draft Autzen Expansion Intergovernmental Agreement between the City of <br />Eugene and the University of Oregon requires that parking be available for park users. <br />Specifically, the University is to hold six spaces in Lot 9 for event -day use by patrons of East <br />Alton Baker Park, It was reported to City staff that a park patron was turned away from Lot <br />9 several hours prior to kickoff one Saturday. <br />Recommendation: The University of Oregon will work to ensure that access to Lot 9 for park <br />users is available on event days. Mitigation of this impact is a high priority and should be in <br />place prior to the 2002 football season. <br />ATTACHMENTS <br />1. Recommendations and Responsibility Matrix <br />2. Sampling of monitoring photographs <br />3. Monitoring Plan 8/23/01 <br />4. Park Coordinate Maps- East and West <br />5. Monitoring report spreadsheets from the following events: <br />- September 1, 2001 <br />- September 8, 2001 (Pre and Post game observation reports included) <br />- September 22, 2001 <br />- October 20, 2001 <br />- November 3, 2001 <br />- December 1, 2001 <br />cc: Steve McBride, Bob Beals- University of Oregon <br />Charlotte Behm, David Sonnichsen- East Alton Baker Park Citizen Planning Committee <br />Andy Peara, Nearby Nature <br />Meg Trendier, WISTEC <br />Scott Snook, Emerald Valley BMX <br />Kurt Corey, City of Eugene, Public Works Director <br />Johnny Medlin, City of Eugene, Parks and Open Space Director <br />ABP Monitoring- 2001 Season Summary Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.