New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Cuthbert, Alton Baker Park
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Cuthbert, Alton Baker Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2014 3:33:55 PM
Creation date
8/20/2014 3:33:54 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
13. Banner poles LT <br /> 14. Extend sides of berm for more capacity LT <br /> 15. Improve Ticket Office LT <br /> 16. Improve signage and sponsor banners surrounding Gate 1 entrance ST — CSD/Mark <br /> CSD's new sponsor recognition plan gets the sponsor banners off of the fence. CSD will refine and take <br /> care of this for the 05 season. <br /> 17. Redesign Hays paths to more easily accommodate Cuthbert patron lines LT <br /> 18. Explore possibilities of using old dog park and gardens as over -flow parking <br /> • Consult Admin rule ST — POS /Johnny <br /> • Logistics ST — CSDIMark <br /> The Admin Order regarding the use of this space limits frequency of use and requires charging a fee to <br /> park. It will be logistically challenging to use this area in the `05 season for public parking for single <br /> events. <br /> 19. Need more "official" entrance from MLK Blvd LT <br /> 20. Build stairs from blockhouse to gravel path way LT <br /> 21. Install permanent utilities and sewers LT <br /> 22. Involve POS in plantings /maintenance of flower beds inside In progress <br /> 23. Add more accessible seating adjacent to berm In progress <br /> 24. Relocate electrical panel from fencing near backstage entry gate to blockhouse ST — FAC/Larry <br /> Work will begin asap in order to complete this for the '05 season. <br /> Design elements /considerations: <br /> 1. Increase and improve backstage area <br /> 2. Relocate dance area which now obstructs sight lines <br /> 3. Change benches and seating in front of stage <br /> 4. Lower stage - dig out dancing area <br /> 5. Add Gate 2 "terminal" <br /> • Consider accessibility points <br /> • Relocate entrance further east on Day Island <br /> 6. Retain existing sq footage of grassy space along gravel walkway to accommodate food, beer garden, when <br /> necessary <br /> 7. Retro bathrooms into Concessions stands with serving windows oriented toward stage <br /> 8. Relocate Ticket Office to MLK entrance <br /> Cuthbert Planning Session V — Issues list, Mar 14.doc/kh <br />
The URL can be used to link to this page
Your browser does not support the video tag.