Date 6/10/06 <br /> List of work items <br /> To be completed by Fall of 2007 <br /> Blue high lighted items are on "The City of Eugene's Pre's Trail Work for 2006 — 2007" <br /> list. <br /> 1. Green Loop trail head <br /> i. Fix tilt on running trail section (Was not done before barking) <br /> ii. Construct new triangle connection <br /> iii. Sand graveled top area to lock loose rock <br /> iv. Bark graveled trail and pathway <br /> v. Construct kiosk area <br /> vi. Groom kiosk area <br /> vii. Install new Pre's Trail sign <br /> viii. NOTE: Running trail section of trail head completed but not to <br /> contractor's specs or to the agreed upon OTC standards. <br /> 2. Green Loop (old section) <br /> i. East end of realignment to Autzen asphalt pathway <br /> i. Fix water issue areas <br /> ii. Construct retaining wall <br /> iii. Constuct trail form end of "deep dip" to Autzen pathway using <br /> agreed upon standards. <br /> iv. Widen trail to 8 feet (western end of "dip" to new realignment <br /> trail) <br /> v. Build up trail edges to prevent vehicle ruts. <br /> vi. Bark trail (1,180 feet) <br /> b. Water corridor <br /> i. Widen trail to 8 feet <br /> ii. Build up trail edges to prevent vehicle ruts <br /> iii. Create apron at "book ands" to handle vehicle traffic across <br /> trail <br /> iv. Bark trail (890 feet) <br /> c. From "book ends" to north side of amphitheater pathway <br /> i. Flatten and widen trail at canoe portage area <br /> ii. Widen trail to 8 feet <br /> iii. Build up trail edges to prevent vehicle ruts <br /> iv. Raise electrical light box <br /> v. Create apron at amphitheater pathway <br /> vi. Bark trail (800 feet) <br /> d. South side of amphitheater pathway to end of wooded area <br /> i. Wide trail to 8 feet (where possible) <br /> ii. Build up trail edges to prevent vehicle ruts <br /> iii. Repair sunken trail sections <br /> iv. Create apron at amphitheater pathway <br /> 1 <br />