Page -2- Pre's Trail Cost Detail <br /> Red Loop <br /> 99 ft. Y- Section North — Bark @$4. ft. $396. <br /> 91 ft. Y- Section South — Bark @$4. ft. 364. <br /> 93 ft. Return — Install @15. ft. 1,395. <br /> O 4 . 475 ft. Pond Trail — Widen @$5. ft. 2,375. <br /> !N 150 ft. To N. Walnut Bridge — Bark @$4. ft. 600. <br /> 2,391 ft. Canal Side Trail — Restore @$15. ft. 35,865. <br /> 40 ft. Knickerbocker Bridge — Install @$15. 600 <br /> 130 ft. Knickerbocker Bridge — Finish @$10. 1,300. <br /> 92 ft. Knickerbocker Bridge — Finish @$7. ft. 644. <br /> 2,309 ft. S. Side River Trail (existing) — Install @$15. ft. 34,635. <br /> 712 ft. Extension — Widen @$7. ft. 4,984. <br /> Sub -Total $83,158. <br /> Totals Green Loop $31,855. <br /> Yellow -Green Connector 3,230. <br /> Yellow Loop (necessary) 12,702. <br /> Yellow Red Connector 5,590. <br /> Red Loop 83,158. <br /> $136,535. <br /> Yellow Loop Additional 14,619. <br /> Amenities (signage etc) 23.000. <br /> TOTAL $174,151. <br /> Currently in City Budget 70,000 <br /> Remaining Funds Needed $104,151 <br /> K \OTC OTCM\Cost Detail of Work to be Completed.doc <br />