New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Pre's Trail in Alton Baker Park
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Pre's Trail in Alton Baker Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2014 2:41:18 PM
Creation date
8/20/2014 2:37:51 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page -2- Pre's Trail Cost Detail <br /> Red Loop <br /> 99 ft. Y- Section North — Bark @$4. ft. $396. <br /> 91 ft. Y- Section South — Bark @$4. ft. 364. <br /> 93 ft. Return — Install @15. ft. 1,395. <br /> O 4 . 475 ft. Pond Trail — Widen @$5. ft. 2,375. <br /> !N 150 ft. To N. Walnut Bridge — Bark @$4. ft. 600. <br /> 2,391 ft. Canal Side Trail — Restore @$15. ft. 35,865. <br /> 40 ft. Knickerbocker Bridge — Install @$15. 600 <br /> 130 ft. Knickerbocker Bridge — Finish @$10. 1,300. <br /> 92 ft. Knickerbocker Bridge — Finish @$7. ft. 644. <br /> 2,309 ft. S. Side River Trail (existing) — Install @$15. ft. 34,635. <br /> 712 ft. Extension — Widen @$7. ft. 4,984. <br /> Sub -Total $83,158. <br /> Totals Green Loop $31,855. <br /> Yellow -Green Connector 3,230. <br /> Yellow Loop (necessary) 12,702. <br /> Yellow Red Connector 5,590. <br /> Red Loop 83,158. <br /> $136,535. <br /> Yellow Loop Additional 14,619. <br /> Amenities (signage etc) 23.000. <br /> TOTAL $174,151. <br /> Currently in City Budget 70,000 <br /> Remaining Funds Needed $104,151 <br /> K \OTC OTCM\Cost Detail of Work to be Completed.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.