Steve Prefontaine Running Trail <br /> Cost Detail of Work to be Completed <br /> There are three main loops from west to east: Green, Yellow, and Red. In addition there <br /> are two connectors and one access from the Alton Baker parking lot. <br /> Green Loon <br /> 162 ft Y- Junction — Install @$15. per ft. $2,430. <br /> 190 ft Access Trail — Bark @ $4, ft. 760. <br /> 216 ft Access Trail — Bark @$4. ft 864. <br /> 931 ft Water Corridor — Widen @$7. ft. 6,517. <br /> 792 ft N. Side/Amphitheater Path - Widen @$7. ft. 5,544. <br /> 465 ft N. Side Woods — Widen @7. ft. 3,255. <br /> 1,449 ft. N. Side/Science Factory- Widen @$5. ft 7,245 <br /> 1,175 ft. S. Side /dog Park to Autzen Path — Widen @$10. ft. 11,750 <br /> Sub -Total $31,855 <br /> Green- Yellow Connector <br /> 190 ft Realign Canal Section @$17. ft $3,230 <br /> Yellow Loop <br /> 9j Necessary: <br /> \ 712 ft. Canal/Gravel Rd — Repair @$10. ft $7,120. <br /> 346 ft. N. Filbert — Finish @$7. ft. 2,422. <br /> Al 163 ft. Loop Return — Finish @$5. ft. 815. <br /> 335 ft. S. Filbert — Finish @$7. ft. 2 345. <br /> Sub -Total $12,702 <br /> Additional: <br /> 723 ft. Cross Back — Install @$15. ft. $10,845. <br /> 197 ft. Willamette River Access — Install @$15. ft. 2,955. <br /> 117 ft. Autzen Aux. Path — Install @$7. ft. 819. <br /> Sub -Total $14,619. <br /> Yellow -Red Connector <br /> 559 ft. Relocate Drainage @10. ft. $5,590. <br />