New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Pre's Trail in Alton Baker Park
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Pre's Trail in Alton Baker Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2014 2:41:18 PM
Creation date
8/20/2014 2:37:51 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page -3- <br /> With OTC's success in securing the 2008 Olympic Trials there is an imperative to finish <br /> the trail by Fall of 2007 and the corresponding trail amenities by Spring of 2008 when <br /> many competing athletes and other visitors will begin using the trail. <br /> Since Parks and Open Spaces has assumed control of the project, it is vitally important <br /> to OTC that the agency have the necessary funds to complete the project on schedule <br /> for the Olympic Trails. And completed to the high standards developed to insure the <br /> viability of this resource for the next 20 years. <br /> Once the restoration is complete the trail will need a minimum of $10,000 per year to <br /> maintain the bark topping. <br /> We hope and expect the end result of all this effort is a permanent memorial to the <br /> memory of Steve Prefontaine. We anticipate that Pre's Trail will serve the recreation <br /> needs of this community well into the future. And that Pre's Trail will remain a resource <br /> that brings us recognition and in which we can continue to take pride. <br /> Action Items <br /> Complete Before 2008 Olympic Trials: <br /> o Refer to Trail Completion Work Schedule <br /> Also the following amenities: <br /> o Inclusion of 3K, 4K, 5K cross back trails <br /> o Information Kiosks — 4 at trail heads and Autzen Bridge. These will serve <br /> as maps, history, and bulletin boards. <br /> o Mileage Markers (in discussion) - Possible low stone marker, to avoid <br /> mower problems, placed every 1 mile with smaller 1 /4 mile markers. <br /> o Directional Signs — Discrete signs indicating Pre's Trail at junctions. <br /> o Hwy Signs — announcing directions to Pre's Trail. Possible locations <br /> 1 -105; MLK Blvd; Alton Baker Park entrance; Coburg Road, etc. <br /> K: \OTC_OTCM \Pre's Trail Master Plan - 2005.doc <br /> Geoff Hughes, Pre's Trail Restoration Chair <br /> Last updated May 12, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.