New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Bethel Community Park, YMCA
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Bethel Community Park, YMCA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2014 12:50:46 PM
Creation date
8/20/2014 12:50:39 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dave Perez <br /> February 3, 2010 <br /> Page 3 <br /> Information to be provided by the Owner <br /> 1. Site base maps in digital format showing property boundaries and easements. <br /> 2. Air photos or other available site mapping, legal description, or other items as available. <br /> 3. Program of building and site needs suitable for feasibility study. <br /> 4. Possible project phases, i.e. pool and wet locker room built later. <br /> 5. Estimated cost of SDC <br /> 6. Cost or evaluation of land value, if needed. <br /> 7. It is assumed that complete land surveys including legal and topographic information are not <br /> available, but will be provided if it is. <br /> 8. It is assumed that geotechnical information is not available, but will be provided if it is. <br /> Design Team <br /> Team members include PIVOT Architecture and Balzhiser & Hubbard Engineers. Inc (Civil). <br /> Compensation <br /> Compensation would be based on hourly billing rates not to exceed the maximum amount of $10,000. <br /> Hours beyond those indicated for this defined scope of work may be necessary as shown below, but in <br /> the support of the YMCA and City this time would be contributed as in kind services by PIVOT. If a <br /> significant change in scope and effort is needed then PIVOT proposes to review services with YMCA <br /> and the City and make adjustments all parties can agree to. <br /> Compensation <br /> PIVOT Architecture Hours Rate /Hour Total <br /> Principal, Architect 30 $140 $4,200 <br /> Designer 4 40 $75 $3,000 <br /> Architect 16 $85 $1,360 <br /> Admin 4 $80 $320 <br /> Subtotal PIVOT $8,880 <br /> Balzhiser & Hubbard <br /> Civil Engineering Services $3,200 <br /> Subtotal BHE $3,200 <br /> Subtotal PIVOT & BHE $12,080 <br /> Less In -Kind Services ($2,080) <br /> rid <br />
The URL can be used to link to this page
Your browser does not support the video tag.