New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Bethel Field Projects: Baseball, Softball
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Bethel Field Projects: Baseball, Softball
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2014 12:45:32 PM
Creation date
8/20/2014 12:42:51 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Fund Folder
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. Maintenance Building: There is a desire and mutual benefit expected in sharing the <br /> proposed maintenance building which is to be divided so that Babe Ruth accesses their <br /> portion from inside the fence and the City accesses its portion from outside the fence. In <br /> order to ensure continuity of the design and aesthetic integrity of the single structure the <br /> City will provide the shell of the building on Babe Ruth's side. The shell will include <br /> foundation, walls, roof, and utilities stubbed into the structure. Babe Ruth will provide <br /> the floor slab, interior finishing as desired, plumbing and electrical. The City will pay the <br /> cost of the building design, permit fees, and Systems Development Charges. The City <br /> will also pay the cost of all monthly utilities to the building if those utilities are only for <br /> maintenance building uses and not extended for other facility uses. <br /> 7. Miscellaneous Facilities: Fencing, gating, ticket booths, and any other improvements <br /> which Babe Ruth may choose to install beyond the outfield fencing to primarily benefit <br /> its program shall be paid for by Babe Ruth. Such improvements must be coordinated <br /> with and approved by the City prior to construction. <br /> We appreciate your review and consideration of these items, and look forward to continuing our <br /> cooperative working relationship to create a quality recreation facility at Bethel Community <br /> Park. <br /> Sincerely, <br /> Andrea G. Riner <br /> Parks Planning Manager <br /> Bethel Community Park March 31, 2000 <br /> 3 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.