New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Friendly Park, 2007
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Friendly Park, 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2014 4:23:15 PM
Creation date
8/19/2014 4:23:12 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Identification_Number
Friendly Park
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EUGENE Public Works <br /> Maintenance <br /> 1820 Roosevelt Boulevard <br /> August 22, 1996 Eugene, Oregon 97402 <br /> (503) 687 -5220 <br /> INVITATION FOR QUOTATIONS <br /> The City of Eugene Parks Planning and Development Office, Public Works Maintenance, 1820 <br /> Roosevelt Blvd., Eugene, OR 97402, will receive quotations for the installation of an area drain <br /> and storm sewer until (Thursday) September 5, 1996, 11:00 a.m. <br /> Work is located in the alley at the east of Friendly Park, 27th and Monroe Streets, and included, <br /> but is not limited to, installing two manholes, one area drain, approximately 205 feet of PVC <br /> drain pipe, pavement repair, finish grading and seeding. <br /> Schedule: Work shall be completed on or before October 11, 1996. Time of construction shall be <br /> limited to any 14 calendar day period prior to completion date specified. <br /> Quotation Form contains a statement that the contractor agrees to carry out the contract in <br /> compliance with all applicable laws, and that provisions of ORS 279.348 - 279.365, relating to <br /> the prevailing rate of wage for projects in excess of $25,000 and Eugene Code 2.030, relating to <br /> labor conditions, will be complied with by the contractor and all subcontractors. <br /> Quotation Form also contains a statement concerning resident contractor status, as defined by <br /> ORS 279.029. Contractors are not required to be licensed for asbestos abatement. No quotations <br /> shall be received or considered by the City unless the contractor is registered with the <br /> Construction Contractors' Board as required by ORS 671.530. <br /> Contract form will be a City of Eugene Purchase Order. One single payment will be made within <br /> 30 days of completion of the work. <br /> The City may reject any quotation not in compliance with public quotation procedures and <br /> requirements, and may reject for good cause any or all quotations or waive any specifications or <br /> requirements upon a finding by the City that it is in the public interest to do so. <br /> John Etter, Project Coordinator, (687 -5325) <br />
The URL can be used to link to this page
Your browser does not support the video tag.