Road Improvements - River Road (River Loop #2 - Carthage) <br /> The records on file in this office indicate that you own 335.49 <br /> feet of road frontage and the Certified Assessment to your property <br /> for this project is as follows: <br /> Linear feet of concrete <br /> curb and gutter (6" base) @ $ /Lin. Ft. = $ <br /> 335.49 Linear feet of concrete <br /> curb and gutter (8" base) @ $ 6.50 /Lin. Ft. = $ 2180.69 <br /> 162.61 Square yards of concrete <br /> sidewalks @ $ 12.50 /Sq. Yd. = $ 2032.63 <br /> Tons of asphalt concrete <br /> driveway @ $ /Ton = $ <br /> 0.00 Square yards of concrete <br /> driveway (6" thick) @ $ 18.00 /Sq. Yd. = $ 0.00 <br /> 33.72 Square yards of concrete <br /> driveway (8" thick) @ $ 22.00 /Sq. Yd. = $ 741.84 <br /> Each of valley gutter <br /> fillet @ $ Each = $ <br /> Linear feet of valley <br /> gutter reinforced @ $ /Lin. Ft. = $ <br /> Extra work requested Lump Sum $ <br /> Sub Total $ 4955.16 <br /> Plus 15% for Engineering and <br /> Contract Administration $ 743.27 <br /> Assessment Total $ 5698.43 <br /> Taxlot #1704022100500 <br /> City Of Eugene <br /> 777 Pearl St Rm 106 <br /> Eugene OR 97401 <br /> Certified Assessment <br /> 1100 -31 7/29/96 - Page 2 <br />