New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Ascot Park, Ballfield, Electrical
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Ascot Park, Ballfield, Electrical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2014 1:52:11 PM
Creation date
8/7/2014 1:51:56 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
rot, Public Works <br /> Engineering <br /> City of Eugene <br /> September 24, 1993 858 Pearl Street <br /> P Eugene, Oregon 97401 <br /> (503) 687 -5291 <br /> Subject: Installation of lighting fixtures at Ascot Park <br /> Dear Property Owner: <br /> This fall, the City of Eugene will install lighting fixtures for the athletic fields at Ascot Park. <br /> The work will be done by Lantz Electric of Pleasant Hill and is scheduled to be completed <br /> by the end of November. The map attached to this letter shows the location of Ascot Park <br /> and where the light fixtures will be installed within the park. <br /> why th l ri fields P <br /> "'elds at Ascot ar k were selected for the <br /> TL,. 1 /� - .. <br /> There, arc a several =sons �•aa�' the � a� aTl� Lla. <br /> lighting project. The park offers parking and restrooms and is popular with city residents. <br /> The fields are well designed, with a buffer between the playing areas and neighboring <br /> properties. The addition of lights also was supported by both the City Recreation Division <br /> and Kidsports because it will allow all age groups to use the facility more intensely. <br /> The Ascot Park project will use the latest technology for lighting the playing fields. Energy- <br /> efficient, metal halide, low -glare lighting fixtures will be mounted on eight poles 60 to 100 <br /> feet high, allowing the lights to be angled downward so they can focus on the playing fields. <br /> This technology, combined with the many perimeter park trees, will significantly reduce light <br /> "spillage" onto neighboring properties. <br /> The manufacturer of the lighting equipment has produced a short video showing how the <br /> lights can provide lighting for the athletic fields without significantly affecting other <br /> properties. If you would like to view the video or discuss the project with City staff, drop <br /> by Public Works Maintenance, 1820 Roosevelt Boulevard, during the noon hour any day <br /> from September 27 to October 1, or call to make an appointment to see the video. No <br /> formal presentations will be made, so make an appointment that is convenient for you. <br /> If you have questions about the athletic programs offered at Ascot Park or at other City <br /> facilities, please call Dave Battaglia at the City of Eugene Recreation Division, 687 -5333. If <br /> you have questions about the Ascot Park lighting project, please call John Etter at the Public <br /> Works Parks Planning section, 687 -5325. <br /> Sincerely, ., <br /> Les L e, P.E. <br /> City Engineer <br /> encl: Map of Ascot Park area <br />
The URL can be used to link to this page
Your browser does not support the video tag.