8. We probably need to do some analysis and be ready to answer the question <br /> of "what if the Ascot Park project was stopped altogether ?" What would it <br /> cost us to get out of that portion of that contract. I would guess that the <br /> contractor has already purchased substantial materials that we will likely <br /> have to pay for. We would likely also have to pay some damages. <br /> 9. Analysis of the number of properties impacted (within 200 ft). <br />